Title Page

  • Audit Category

  • Audit Title

  • Conducted on

  • undefined

DETAILS OF WORK

  • Plant/Equipment Name

  • Location of Work

  • Description of Work

  • Date of Work

  • Expected duration of Work

TYPES OF HOT WORK

  • Welding

  • TIG Welding

  • Please Read SOP

  • SOP Available

  • Please Fill JSEA

  • Job Details

  • Location of Work

  • JSEA Developed by

  • Date

  • Personnel Involved in Activity

  • Name of Relevant Worker

  • Qualification / Licenses / Ticket Held

  • Signature

  • Personnel Involved in Activity

  • Name of Relevant Worker

  • Qualification / Licenses / Ticket Held

  • Signature

  • Common Hazards

  • Work Environment/Site Layout

  • Working from Height

  • Ground Surface

  • Stability

  • Security

  • Vibration

  • Confined Spaces

  • Site Access/Egress

  • Underground Hazards

  • Lighting

  • Mobil Plant/Pedestrians

  • House Keeping

  • Asbestos

  • Thermal Comfort

  • Slips & Trips

  • Overhead Hazards

  • Site induction

  • Chemical

  • Biological

  • Fire/Flammability

  • Corrosive

  • Compatibility

  • Labelling

  • MSDS Available

  • Absorption

  • Inhalation/Ingestion

  • Signage

  • Spill Control

  • Storage

  • PPE Available

  • Manual Handling

  • Repetitive Actions

  • Cold/Hot

  • Lifting/Carrying

  • Bending/Reaching

  • Excessive Distances

  • Awkward Postures

  • High Forces- Heavy Load

  • Pushing/Pulling

  • Restraining/Supporting

  • Stability/Size of Load

  • Plant

  • Crushing

  • Cutting/Stabbing

  • Electrical

  • Entanglement

  • Falling

  • High Pressure

  • Hot Surfaces

  • Isolation

  • Maintenance

  • Noise

  • Pre-start Checks

  • Striking

  • Signage

  • Safe Work Procedures

RISK MATRIX

  • HSW RISK MATRIX

JOB SAFETY ANALYSIS

  • Job Safety Analysis

  • Task

  • Hazards

  • Potential Risk Score

  • Risk Control Measures

  • Residual Risk Score

  • Responsible Person

  • Task

  • Hazards

  • Potential Risk Score

  • Risk Control Measures

  • Residual Risk Score

  • Responsible Person

  • Task

  • Hazards

  • Potential Risk Score

  • Risk Control Measures

  • Residual Risk Score

  • Responsible Person

  • Safe Fire Exit Identified and Unobstructed

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • All Wall/floor openings have been covered

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Fire retardant covers in place

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • All Employees have completed the required training

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Combustibles within 3 meters have been removed or shielded

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Fire system is not impaired or isolated (alarms/hydrant water)

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Are Hot work being Conducted on or near EPS paneling?

  • Have you covered EPS panel?

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • There are no other hazardous gases or vapours within 15 meters

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Is Hot work Carried Outside?

  • Total Fire Ban day Checked (Hot Work is not to be completed outside during a declared Total Fire Ban without permit from local fire brigade)

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Fire fighting equipment is available & fit for purpose

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Ventilation is adequate

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • All operators have appropriate PPE for the task

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Hot Work equipment is in good condition and testing is current

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Enclosed equipment (tanks, silos) have been cleaned and purged

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Electrical cables, wiring, hydraulic and pneumatic lines, stainless steel equipment shielded from contact with hot metal, weld splatter, welding electrodes etc.

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Screens, barriers, or blankets in place

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Stick Welding

  • Please Read SOP

  • SOP Available

  • Please Fill JSEA

  • Job Details

  • Location of Work

  • JSEA Developed by

  • Date

  • Personnel Involved in Activity

  • Name of Relevant Worker

  • Qualification / Licenses / Ticket Held

  • Signature

  • Personnel Involved in Activity

  • Name of Relevant Worker

  • Qualification / Licenses / Ticket Held

  • Signature

  • Common Hazards

  • Work Environment/Site Layout

  • Working from Height

  • Ground Surface

  • Stability

  • Security

  • Vibration

  • Confined Spaces

  • Site Access/Egress

  • Underground Hazards

  • Lighting

  • Mobil Plant/Pedestrians

  • House Keeping

  • Asbestos

  • Thermal Comfort

  • Slips & Trips

  • Overhead Hazards

  • Site induction

  • Chemical

  • Biological

  • Fire/Flammability

  • Corrosive

  • Compatibility

  • Labelling

  • MSDS Available

  • Absorption

  • Inhalation/Ingestion

  • Signage

  • Spill Control

  • Storage

  • PPE Available

  • Manual Handling

  • Repetitive Actions

  • Cold/Hot

  • Lifting/Carrying

  • Bending/Reaching

  • Excessive Distances

  • Awkward Postures

  • High Forces- Heavy Load

  • Pushing/Pulling

  • Restraining/Supporting

  • Stability/Size of Load

  • Plant

  • Crushing

  • Cutting/Stabbing

  • Electrical

  • Entanglement

  • Falling

  • High Pressure

  • Hot Surfaces

  • Isolation

  • Maintenance

  • Noise

  • Pre-start Checks

  • Striking

  • Signage

  • Safe Work Procedures

RISK MATRIX

  • HSW RISK MATRIX

JOB SAFETY ANALYSIS

  • Job Safety Analysis

  • Task

  • Hazards

  • Potential Risk Score

  • Risk Control Measures

  • Residual Risk Score

  • Responsible Person

  • Task

  • Hazards

  • Potential Risk Score

  • Risk Control Measures

  • Residual Risk Score

  • Responsible Person

  • Task

  • Hazards

  • Potential Risk Score

  • Risk Control Measures

  • Residual Risk Score

  • Responsible Person

  • Safe Fire Exit Identified and Unobstructed

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • All Wall/floor opeanings have been covered

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Fire retardant covers in place

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • All Employees have completed the required training

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Combustibles within 3 meters have been removed or shielded

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Fire system is not impaired or isolated (alarms/hydrant water)

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Are Hot work being Conducted on or near EPS paneling?

  • Have you covered EPS panel?

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • There are no other hazardous gases or vapours within 15 meters

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Is Hot work carried Outside?

  • Total Fire Ban day Checked (Hot Work is not to be completed outside during a declared Total Fire Ban without permit from local fire brigade)

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Gas detection undertaken and documented

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Fire fighting equipment is available & fit for purpose

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Ventilation is adequate

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • All operators have appropriate PPE for the task

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Hot Work equipment is in good condition and testing is current

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Enclosed equipment (tanks, silos) have been cleaned and purged

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Electrical cables, wiring, hydraulic and pneumatic lines, stainless steel equipment shielded from contact with hot metal, weld splatter, welding electrodes etc.

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Screens, barriers, or blankets in place

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Oxy Acetykene Welding

  • Please Read SOP

  • SOP Available

  • Please Fill JSEA

  • Job Details

  • Location of Work

  • JSEA Developed by

  • Date

  • Personnel Involved in Activity

  • Name of Relevant Worker

  • Qualification / Licenses / Ticket Held

  • Signature

  • Personnel Involved in Activity

  • Name of Relevant Worker

  • Qualification / Licenses / Ticket Held

  • Signature

  • Common Hazards

  • Work Environment/Site Layout

  • Working from Height

  • Ground Surface

  • Stability

  • Security

  • Vibration

  • Confined Spaces

  • Site Access/Egress

  • Underground Hazards

  • Lighting

  • Mobil Plant/Pedestrians

  • House Keeping

  • Asbestos

  • Thermal Comfort

  • Slips & Trips

  • Overhead Hazards

  • Site induction

  • Chemical

  • Biological

  • Fire/Flammability

  • Corrosive

  • Compatibility

  • Labelling

  • MSDS Available

  • Absorption

  • Inhalation/Ingestion

  • Signage

  • Spill Control

  • Storage

  • PPE Available

  • Manual Handling

  • Repetitive Actions

  • Cold/Hot

  • Lifting/Carrying

  • Bending/Reaching

  • Excessive Distances

  • Awkward Postures

  • High Forces- Heavy Load

  • Pushing/Pulling

  • Restraining/Supporting

  • Stability/Size of Load

  • Plant

  • Crushing

  • Cutting/Stabbing

  • Electrical

  • Entanglement

  • Falling

  • High Pressure

  • Hot Surfaces

  • Isolation

  • Maintenance

  • Noise

  • Pre-start Checks

  • Striking

  • Signage

  • Safe Work Procedures

RISK MATRIX

  • HSW RISK MATRIX

JOB SAFETY ANALYSIS

  • Job Safety Analysis

  • Task

  • Hazards

  • Potential Risk Score

  • Risk Control Measures

  • Residual Risk Score

  • Responsible Person

  • Task

  • Hazards

  • Potential Risk Score

  • Risk Control Measures

  • Residual Risk Score

  • Responsible Person

  • Task

  • Hazards

  • Potential Risk Score

  • Risk Control Measures

  • Residual Risk Score

  • Responsible Person

  • Safe Fire Exit Identified and Unobstructed

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • All Wall/floor opeanings have been covered

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Fire retardant covers in place

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • All Employees have completed the required training

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Combustibles within 3 meters have been removed or shielded

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Fire system is not impaired or isolated (alarms/hydrant water)

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Are Hot work being Conducted on or near EPS paneling?

  • Have you covered EPS panel?

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • There are no other hazardous gases or vapours within 15 meters

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Is Hot work carried Outside?

  • Total Fire Ban day Checked (Hot Work is not to be completed outside during a declared Total Fire Ban without permit from local fire brigade)

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Fire fighting equipment is available & fit for purpose

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Ventilation is adequate

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • All operators have appropriate PPE for the task

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Hot Work equipment is in good condition and testing is current

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Enclosed equipment (tanks, silos) have been cleaned and purged

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Electrical cables, wiring, hydraulic and pneumatic lines, stainless steel equipment shielded from contact with hot metal, weld splatter, welding electrodes etc.

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Screens, barriers, or blankets in place

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Flame Cutting

  • Safe Fire Exit Identified and Unobstructed

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • All Wall/floor opeanings have been covered

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Fire retardant covers in place

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • All Employees have completed the required training

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Combustibles within 3 meters have been removed or shielded

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Are Hot work being Conducted on or near EPS paneling?

  • Have you covered EPS panel?

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • There are other hazardous gases or vapours within 15 meters

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Is Hot work is outside

  • Total Fire Ban day Checked (Hot Work is not to be completed outside during a declared Total Fire Ban without permit from local fire brigade)

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Fire fighting equipment is available & fit for purpose

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Fire system is not impaired or isolated (alarms/hydrant water)

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Gas detection undertaken and documented

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Ventilation is adequate

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • All operators have appropriate PPE for the task

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Hot Work equipment is in good condition and testing is current

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Enclosed equipment (tanks, silos) have been cleaned and purged

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Screens, barriers, or blankets in place

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Electrical cables, wiring, hydraulic and pneumatic lines, stainless steel equipment shielded from contact with hot metal, weld splatter, welding electrodes etc.

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Grinding/ Disc Cutting

  • Safe Fire Exit Identified and Unobstructed

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • All Wall/floor opeanings have been covered

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Fire retardant covers in place

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • All Employees have completed the required training

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Combustibles within 3 meters have been removed or shielded

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • There are other hazardous gases or vapours within 15 meters

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Fire fighting equipment is available & fit for purpose

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Fire system is not impaired or isolated (alarms/hydrant water)

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Gas detection undertaken and documented

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Ventilation is adequate

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • All operators have appropriate PPE for the task

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Enclosed equipment (tanks, silos) have been cleaned and purged

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Screens, barriers, or blankets in place

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Brazing

  • Safe Fire Exit Identified and Unobstructed

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • All Wall/floor opeanings have been covered

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Fire retardant covers in place

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • All Employees have completed the required training

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Combustibles within 3 meters have been removed or shielded

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Are Hot work being Conducted on or near EPS paneling?

  • Have you covered EPS panel?

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • There are other hazardous gases or vapours within 15 meters

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Is Hot work is outside

  • Total Fire Ban day Checked (Hot Work is not to be completed outside during a declared Total Fire Ban without permit from local fire brigade)

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Fire fighting equipment is available & fit for purpose

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Fire system is not impaired or isolated (alarms/hydrant water)

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Gas detection undertaken and documented

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Ventilation is adequate

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • All operators have appropriate PPE for the task

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Hot Work equipment is in good condition and testing is current

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Enclosed equipment (tanks, silos) have been cleaned and purged

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Screens, barriers, or blankets in place

  • Suspend Permit, Please check with Permit Issuer/ Manager

  • Electrical cables, wiring, hydraulic and pneumatic lines, stainless steel equipment shielded from contact with hot metal, weld splatter, welding electrodes etc.

  • Suspend Permit, Please check with Permit Issuer/ Manager

TOOLS/EQUIPMENT TO BE USED

  • Tools/Equipment

ISOLATION REGISTER

  • Isolation Required

  • Employee Name

  • Plant/Equipment Name

  • Time Locks were attached

  • Time Locks were removed

  • Signature

  • Isolation Required

  • Employee Name

  • Plant/Equipment Name

  • Time Locks were attached

  • Time Locks were removed

  • Signature

  • Isolation Required

  • Employee Name

  • Plant/Equipment Name

  • Time Locks were attached

  • Time Locks were removed

  • Signature

  • Isolation Required

  • Employee Name

  • Plant/Equipment Name

  • Time Locks were attached

  • Time Locks were removed

  • Signature

SAFETY OBSERVATION

  • Is Safety Observer Required

  • Safety Observer

  • Contact Number

  • Location of nearest fire alarm

  • Observer Initial area check upon completion of work

  • Observer secondary area check 15 minutes post work completion

  • Observer Final area check 60 minutes post work completion

AUTHORISATION

  • I have reviewed the hazards and control measures documented in the relevant JSEA/SOP for this task. I believe that the work can be completed safely provided all the above-mentioned precautions and the relevant JSEA/SOP are complied with

  • Permit Issuer

  • Permit User

  • Permit User

  • Safety Observer

  • Name and Signature

PERMIT SUSPENSION

  • The permit has been suspended due to work not being completed. The following precautions have been completed in the work area

  • Equipment Secured

  • Area access restricted

  • Isolation retested

  • Signage in place

  • Area Manager notified

PERMIT REVALIDATION

  • This Permit has been revalidated to allow suspended work to be recommenced. The following precautions have been completed

  • Area Inspected

  • Environmental conditions safe

  • Pre-start checks completed

  • Area Manager notified

  • Permit Issuer

  • Permit User

COMPLETION OF WORK VERIFICATION

  • I have inspected the work area and certify that all personnel, tools and equipment have been removed from the area, all guards and covers have been replaced, all LOTO devices have been removed and all barriers and notices removed. I confirm that the area is safe for normal operations to resumes.

  • Permit Issuer

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.