Permit Work Details
-
Site Name
-
Contractor carrying out the work
-
Supervised by
-
Area to be worked in
-
Work to be carried out
-
Plant/Equipment to be used
Precautions to be taken
-
Area cleared of all loose combustible material?
-
Opposite side of walls, partitions or ceilings cleared if risk of fire by conducted heat is present?
-
Suitable extinguishers of appropriate type at hand. Specify type:
-
Specify type
-
Exposed wooden flooring or other combustible fixtures protected?
-
Is a fire watch required whilst works are in progress?
-
When welding, cutting or grinding the work area is suitably screened?
-
Will the work area require to be dampened down / sprayed with water during works?
-
Are gas cylinders secured in a vertical position and fitted with regulator & Flashback arrestor?
-
Are gas cylinders in good condition with all dials etc functioning?
-
Will periodic checks be carried out for the hour after hot works are complete?
-
Will a final check be carried out of the area after one hour?
-
Specify conditions for Tar boilers to be placed at ground level or in a position convenient for works.
-
Is a non-combustible heat insulated base provided for the Tar boiler?
-
Specify the type of fire extinguisher at hand:
-
Gas cylinders will be sited at least 3m from the burner?
-
Is the boiler sited where spillage can be easily controlled?
-
A lit tar boiler will never be left unattended?
-
If accessible by the public, are flammable materials removed from the location before signing off on the permit?
-
Work to start:
-
Work to finish:
-
Time limit:
AUTHORISATION
-
I am satisfied that it is safe to do the work stated, provided that the above instructions are carried out (Midwest Manager Print Name)
-
Midwest Manager Signature
-
I am fully aware of and understand the requirements stated on this permit (Operative Print Name)
-
Operative (Operative Signature)
-
Date
WORKS COMPLETED AND AREA SAFE
-
Midwest Manager Print Name
-
Midwest Manager Signature