Title Page
-
Project title
-
Location of work
-
Date
-
Description of work
-
Permit applicant (Lifting Supervisor)
-
To attach photo of evidence as much as possible
Lifting details
A) Details of lifting crew
-
Lifting Supervisor
-
Lifting Supervisor
-
Crane Operator
-
Crane Operator
-
Rigger
-
Rigger
-
Signalman
-
Signalman
B) Details of lifting equipment
Lifting machines
LM 1
-
Type of equipment
-
LM No.
-
Date of expiry
-
Maximum SWL
LM 2
-
Type of equipment
-
LM No.
-
Date of expiry
-
Maximum SWL
Lifting gears
LG 1
-
Type of equipment
-
LG No.
-
Date of expiry
-
SWL
LG 2
-
Type of equipment
-
LG No.
-
Date of expiry
-
SWL
LG 3
-
Type of equipment
-
LG No.
-
Date of expiry
-
SWL
LG 4
-
Type of equipment
-
LG No.
-
Date of expiry
-
SWL
LG 5
-
Type of equipment
-
LG No.
-
Date of expiry
-
SWL
LG 6
-
Type of equipment
-
LG No.
-
Date of expiry
-
SWL
C) Details of load / material
Load 1
-
Description of load
-
Dimension
-
Weight of load
Load 2
-
Description of load
-
Dimension
-
Weight of load
Load 3
-
Description of load
-
Dimension
-
Weight of load
Load 4
-
Description of load
-
Dimension
-
Weight of load
Load 5
-
Description of load
-
Dimension
-
Weight of load
Load 6
-
Description of load
-
Dimension
-
Weight of load
Load 7
-
Description of load
-
Dimension
-
Weight of load
Load 8
-
Description of load
-
Dimension
-
Weight of load
Lifting calculations base on the maximum load
-
Maximum load
-
Maximum working radius
-
Corresponding SWL
-
Weight of lifting gears
-
Factor of safety: safe working load / (maximum weight of load + weight of lifting gears) =
-
Crane capabilities: (maximum weight of load + weight of lifting gears) / safe working load X 100= %
Endorsement of PTW
Section A- Permit applicant
-
I hereby submit this form for clearance prior to lifting activity. I fully understand the nature of work & confirm the lifting activity is WSH compliance
-
Name
Section B- SHE Personnel
-
I have reviewed the permit and SHE requirements for the work and instructed all personnel to eliminate or critically reduce the risks and impacts. Work shall be stopped if there is a change in work conditions.
-
Name
Section C- Operation manager / Field Manager / Project Manager
-
I am satisfied that all reasonably practicable measures are / will be implemented and enforced, and the working personnel are informed of the Safety, Health, Environment hazards / impacts. Work shall be stopped if there is a change in work conditions.
-
Name
Section D- Closing of permit by Permit applicant
-
Status of closing permit
- Work completed
- Housekeeping had been carried out
- Work area is safe for other personnel
-
Permit applicant
SHE requirement prior to lifting activity
Physical & environmental considerations
-
To take photo as much as possible
-
Briefed lifting crew of the activity
-
Lifting crew to check LM / LG before use
-
Are the outriggers evenly extended?
-
Is the ground made safe (e.g., placing steel plate)?
-
Are there any overhead obstacles such as power lines?
-
Are there nearby buildings or structure, equipment or stacked materials that may obstruct lifting operation from being carried out safely?
-
Has the zone of operation been barricaded (with warning signs and barriers) to prevent unauthorised access?
-
Is the lighting condition adequate?
-
Means of communications
- Radio
- Verbal
- Hand signals
-
No strong wind or thunderstorm?
-
Provision of tagline?
Inspected by
-
Lifting Supervisor
-
Overall safe to work
Verified by
-
Safety Personnel
-
Evaluation