Title Page
-
Site name
-
Conducted on
-
Prepared by
-
Location
-
Pesticide being used
-
Has the application rate been agreed and contractor issued with Gazelle SG mixing and calibration document?
Pre-commencement
People
-
Are all operators qualified?
-
Are copies of certificates on file?
CoSHH & PPE
-
Does the CoSHH assessment identify appropriate PPE?
-
Eye/face protection (EN 166)
-
Protective gloves (EN 374)
-
Protective coveralls
-
Water-repellent boots
-
Has the contractor been issued with the CoSHH assessment and the PPE agreed?
Pesticide approvals
-
Has the "off-label" approval been checked and provided to the contractor?
Buffer zones
-
Has the site been walked and watercourses marked on map?
-
Have drains been checked to ensure they are not connected to watercourses?
-
Are more sensitive areas, such as water sources or designated sites, marked on ground with canes and tape?
Equipment
-
Does the contractor have appropriate site and vehicle pesticide storage container?
-
Do operators have appropriate nozzles for the task?
Records
-
Does the contractor understand the reporting requirements and have the appropriate form?
Public access
-
Are access routes identified on the map?
-
Are temporary diversions necessary?
-
Does the access need buffer areas left untreated?
-
Have path buffers been marked with canes and tape?
-
Has sign placement been planned to cover likely points of access?
Designated sites
-
Does the site cover any areas of high conservation value? E.g SSSI, SAC, SPA
-
Has the appropriate agency been consulted?
-
Has approval been obtained?
Site map
-
Has the site map been checked and given to contractor?
Completion Records
Records
-
Has the pesticide application record been returned by contractor?
-
Has the pesticide application record been checked and filed?
-
Have ill-effects (if any reported) been recorded and followed up?
Public access
-
Have signs been removed from site the following day?
Waste management
-
Has all waste been removed from site and disposed of correctly?
Supervision & Management
Observations
-
Date
-
Comments
-
Follow-up visits
-
Date
-
Comments
-
Date
-
Comments
-
Date
-
Comments
-
Date
-
Comments