Title Page

  • Site name

  • Conducted on

  • Prepared by

  • Location
  • Pesticide being used

  • Has the application rate been agreed and contractor issued with Gazelle SG mixing and calibration document?

Pre-commencement

People

  • Are all operators qualified?

  • Are copies of certificates on file?

CoSHH & PPE

  • Does the CoSHH assessment identify appropriate PPE?

  • Eye/face protection (EN 166)

  • Protective gloves (EN 374)

  • Protective coveralls

  • Water-repellent boots

  • Has the contractor been issued with the CoSHH assessment and the PPE agreed?

Pesticide approvals

  • Has the "off-label" approval been checked and provided to the contractor?

Buffer zones

  • Has the site been walked and watercourses marked on map?

  • Have drains been checked to ensure they are not connected to watercourses?

  • Are more sensitive areas, such as water sources or designated sites, marked on ground with canes and tape?

Equipment

  • Does the contractor have appropriate site and vehicle pesticide storage container?

  • Do operators have appropriate nozzles for the task?

Records

  • Does the contractor understand the reporting requirements and have the appropriate form?

Public access

  • Are access routes identified on the map?

  • Are temporary diversions necessary?

  • Does the access need buffer areas left untreated?

  • Have path buffers been marked with canes and tape?

  • Has sign placement been planned to cover likely points of access?

Designated sites

  • Does the site cover any areas of high conservation value? E.g SSSI, SAC, SPA

  • Has the appropriate agency been consulted?

  • Has approval been obtained?

Site map

  • Has the site map been checked and given to contractor?

Completion Records

Records

  • Has the pesticide application record been returned by contractor?

  • Has the pesticide application record been checked and filed?

  • Have ill-effects (if any reported) been recorded and followed up?

Public access

  • Have signs been removed from site the following day?

Waste management

  • Has all waste been removed from site and disposed of correctly?

Supervision & Management

Observations

  • Date

  • Comments

  • Follow-up visits

  • Date

  • Comments

  • Date

  • Comments

  • Date

  • Comments

  • Date

  • Comments

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.