General Information

  • Site location

  • Inspection date

  • Inspected by

  • Project/Programme reference

  • Contractor and representative

  • Customer present

Works Inspection Details

  • Roof Replacement checklist

  • Start sate

  • End date

  • Type of roof

  • Have the correct tiles/materials been used?

  • Are there any missing roof tiles and are tiles fitted correctly and free from damage?

  • Has a breathable roof covering been applied if specified?

  • Has the lead valley been replaced correctly?

  • Are the valley upstands the required depth?

  • Has dry verge been installed?

  • Has all leadwork been replaced? (flashings/soakers)

  • If applicable has satellite dish been put back up?

  • Have BT cables been removed, tided up where applicable?

  • Has loft installation been topped up in accordance with regulations?

  • Roof replacement - Are there any follow up snags?

  • Secondary roof

  • Start date

  • End date

  • Type of secondary roof

  • Type of roof?

  • Have the correct tiles/materials been used?

  • Are there any missing roof tiles and are tiles fitted correctly and free from damage?

  • If a flat roof has been installed is it free from pooling water?

  • Has dry verge been installed

  • Secondary roof - Are there any follow up snags?

  • Roofline & rainwater goods

  • Start date

  • End date

  • Have the correct tiles been used to replace the first two rows of tiles?

  • Are there any missing roof tiles and are tiles fitted correctly and free from damage?

  • Where mortar has been used, is this tidy?

  • Have rainwater goods been replaced? Note how many downpipes

  • Are all downpipe clips present and free from damage?

  • Have downpipes been correctly aligned and correctly fit the connections below with no damage to existing drainage?

  • Are downpipes correctly fitted to gutters?

  • Have gutters been replaced, fitted correctly and no visible leaks present?

  • Are end caps present for gutters?

  • Have correct gutter brackets been used?

  • Have fascia's and soffits been replaced, fitted correctly and free from damage?

  • Roofline and rainwater - Are there any follow up snags?

General Site details and Sign Off

  • Has the site been left clean and tidy?

  • Has all waste been removed?

  • Is scaffolding present?

  • Has customer reported any issues?

  • Overall inspection rating?

  • Contractor agreed for snags to be completed within 5 days?

  • Places for People Initials

  • Contractor Initials

  • Customer Initials

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.