General Information
-
Site location
-
Inspection date
-
Inspected by
-
Project/Programme reference
- CCU
- Rewire
-
Contractor and representative
-
Customer present
Works Inspection Details
-
CCU
-
Start sate
-
End date
-
Has a new CCU unit been installed and location?
-
Is the CCU accessible and labelled up correctly?
-
CCU snags - Are there any follow up snags?
- 0
- 1
- 2
- 3
- 4
- 5
- 6
- 7
-
Has the property has a rewire?
-
Start date
-
End date
-
Have the correct number of sockets been installed in each room, including 2 USB sockets?
-
Have all chasings been patched in correctly and to a suitable standard?
-
Are all smoke alarms hard-wired and linked in then property?
-
Locations of smoke alarms
- Lounge
- Hallway
- Landing1
- Landing2
- Other
-
New light switches throughout?
-
New light pendants throughout?
-
Is earth bonding present and connected correctly?
-
Has 100amp isolator been installed? (Take photo of meter cupboard)
-
Rewire - Are there any follow up snags?
- 0
- 1
- 2
- 3
- 4
- 5
- 6
- 7
General Site details and Sign Off
-
Has the site been left clean and tidy?
-
Has all waste been removed?
-
Is scaffolding present?
-
Has customer reported any issues?
-
Overall inspection rating?
-
Contractor agreed for snags to be completed within 5 days?
-
Places for People Initials
-
Contractor Initials
-
Customer Initials