Title Page
-
Client/Customer
-
Site Name
-
Contract No
-
Conducted on
-
Prepared by
-
Location
-
Purpose of Visit
-
Product Type
Site Risk Assesment
-
Does site have a COVID-19 Risk Assesment
-
Vehicle Access & Egress
-
Are site approach roads clear of low bridges
-
Is there a designated traffic route allocated by site
-
Are there any time restrictions on delivery/collection vehicles
-
Is site clear of over head cables
-
Is vehicle route to lift area clear of overhanging trees
-
Is vehicle route and lifting area clear of underground services and voids
-
Is the lifting area clear from water courses and reservoirs
-
Is the lifting area clear from Network Rail tracks or airports
-
Have site applied for any road closures or parking bay restrictions
-
Is there parking onsite for fit out crews and lifting team vehicles
Lift Details
-
Site access width
-
Site access height
-
Ground conditions
- Concrete
- Tarmac
- Crane base (TWD)
- Type 2 Crush
- Trackway
- Other
-
Foundation type
-
Temporary works designed provided by client for foundations
-
Photograph landing Area for cabins
-
Maximum Radius of Lift
-
Lifting Equipment Required
- Mobile Crane
- Lorry Loader
- Tower Crane
- Fork Lift
- Tracked crane
- other
Project Information
-
Site Contact Name
-
Site Contact number
-
Site Contact Email
-
Requested date of installation/collection
-
Signed off Drawing available
-
How long Site Induction
-
PPE Requirements
- Hard Hat
- Chin Strap
- Hi Vis waist coat
- Hi - Vis full length sleeve top
- Orange trouser
- Safety Glasses
- Safety Boots
- Safety Gloves
- Task Specific
- Other
Customer Information
-
Customer Responsibilites