Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
PROJECT MANAGEMENT
-
Project Manager - Site Manager Team
InspectIon Report Issued To
-
Recipient's Names
INSPECTION CHECKLIST
Lighting Conditions
-
Internal/External Lighting Conditions
Site Conditions
-
Housekeeping/Site Neat & Tidy?
-
Ground conditions - eg: muddy conditions, ground stability
Waste Material
-
Designated Materials Storage Areas
-
Adequate Waste Control Facilities in place eg: Skip/Waste Bins
Air Quality
-
Is dust, vapours & fumes being adequately being controlled
-
Designated Smoking Area's
Site Security
-
Are the site gates (pedestrian & vehicle access) being closed/locked
-
Site Perimeter Fencing/Hoarding in good order
Site Access
-
Access ways Neat/Tidy & Free of Equipment/Debris
-
Are Passageways & Emergency Accessways Clear
Site Welfare/Amenities
-
Are all site welfare/amenities clean/tidy & well maintained
Site Welfare Services
-
Is there sufficient site services (temporary power boards, water points & toilets)
Site Welfare & Perimeter Signage
-
Up to date & well maintained
Sign In Register
-
Pickerings Hire & Client Sign In Register being filled in daily
PPE Compliance
-
Is Mandatory PPE Requirements being complied with?
Noise Control
-
Is construction noise being monitored & adequately controlled
Fall Protection
-
Handrails/Protective Barriers/Mesh Required
-
Tripping Hazards
-
Harness Required
-
Correct Use Of Ladders
-
Deep Excavations Control Measures/Boarding Over Holes/Pits/Gaps
Scaffold Compliance (Mobile & Fixed)
-
Installed by Licensed Scaffolder. Does it have the required scaffold tags & signage
-
Is Scaffold Duty Adequate & Safe For Intended Use
-
Scaffolder Users Pre Start Toolbox Talk Conducted
-
Scaffold Inspection Checklist Used Regularly
-
Are exclusion zones In place with adequate signage
Site Safety Checklists
-
Daily/Weekly Site Safety Checklists Being Completed
Daily Site Diary
-
Is the daily site diary being filled in, printed off, signed & filed in the appropriate folder
Inductions
-
Are all site personnel/visitors inducted
-
Are Inductions forms being correctly fill in & registered
Toolbox Talks
-
Are Toolbox talks being conducted regularly
Risk Managements
-
Is the Risk Assessment Register up to date
-
Is the Site Specific Risk Assessment up to date & displayed on site notice board
-
Are Work Activity Specific Risk Assessments in place
Method Statemants
-
Are Method Statements up to date
-
Have Method Statements been approved
1st Aid
-
1st Aid Kit in Place & Adequately Stocked
-
Is Ambulance/Emergency Vehicle Access adequate
-
Is there an accident book present in the site office
Emergency Requirements & Equipment
-
Is the Site Emergency Evacuation Plan in place & up to date
-
Is the Emergency Evacuation Assembly Area Signposted
-
Is the Emergency Equipment in place (siren, fire blanket, fire extinguisher, spill kit)
-
Is the nearest Hospital with an A&E department address and telephone No displayed on the site notice board with a route card showing location of hospital
Work Permits
-
Ladder Permits
-
Lifting Permits
-
Scaffold Permits
Injuries & Near Misses
-
Are Injuries being registered, reported & investigated
-
Are near misses being reported & investigated
Underground Services Identification
-
Has underground services been identified on this site(as builts, dial before you dig & services locator)
Electrical Compliance
-
Electrical Register Up To Date
-
Is there adequate RCD protection on site
-
Electrical Compliance ( tagging of all leads, electrical equipment)
-
Onsite Generators RCD protected
-
Welfare electrical items PAT test in date
Temporary Distribution Boards
-
Is The Temporary DB in a Suitable Location (does the DB have 1m clearance in front for access) & does the cover have a retaining hinge & is it lockable
-
Main Isolating Switch Within Temporary DB
-
Is the board secured to the wall or ground, does it have support brackets & cut outs for leads
Plant & Equipment
-
Is all plant on site inducted & registered?<br>Are the following details being provided, copied & filed;<br>Plant details<br>Licenses<br>Maintenance records<br>Operator licenses<br>Chains/slings/pipes etc records
-
Are All Guards/Screens on Equipment being checked and present(eg. Grinders, drop saws, welding screens etc)
-
Welding/Cutting Equipment Secure & Isolated (eg. Oxy/acetylene bottles on trolleys/chained & not in passageways
-
Are surrounding conditions for plant & equipment safe ie: access, ground conditions & overhead factors
COSHH - Hazardous Substances & Safety Data Sheets (SDS's)
-
Is the COSHH Register & S DS data sheets up to date (are SDS's less than 5 years old)
-
Are there any hazardous/ dangerous goods on site & are these stored/ controlled appropriately
Traffic Control (AS1742.3)
-
Is the Site Traffic Management Plan up to date
-
If required is the necessary signage & traffic control personnel in place
Site Management Plans
-
Are the Site Safety, Site Management, Environmental Management & Waste Management Plans on site & up to date
Environment Controls
-
Are adequate environmental controls in place ie: siltation, water, dust, noise & heritage
Other Observations
-
ADD DETAILS HERE IF ANY
-
ADD PHOTOS HERE IF NECESSARY
Conclusions & General Recommendations
-
Work to be immediately implemented to rectify the above defects to make the site safe as soon as possible
Sign Off
-
On Site Representative Signature
-
Author's Signature