Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Was EOD closing performed the prior evening?
-
We're the applicable ASN's and ATI's confirmed?
-
We're all cycle counts completed prior to PI
-
Has SOLO been balanced and segregated.
-
Has the USB memory stick been cleared?
-
Was the inventory frozen?
-
Did a huddle meeting occur with RGIS prior to the start of the PI?
-
Did the PI start on time?
-
Were "Do not inventory" signs posted in the following areas? (Actron, wheel cover display, powermate, brake controllers, neon, used batteries, second source, air tool, outbound ATIs, brake display)
-
Were "multi-sku" and "multi-quantity" signs posted in the following areas? (Internal engine, spark plugs, hose clamps)
-
Have all areas been tagged by RGIS?
-
Is store properly staffed for PI (4 people)?
-
Have TMs been trained on uniform PI variance corrections? (+/-)
-
Were bulk fluids organized by style and one representation on top case?
-
Did RGIS supply an ample amount of drop tags?
-
Did RGIS drop tags after completing each shelf (HP) and/or 4ft section (SF)?
-
Has the "Back 10" verification been performed with each RGIS counter?
-
Was the bulk hose pre-counted?
-
Is the POG tracking form utilized?
-
Are gift cards and MCCs counted?
-
Were Hard Part POGs set and labeled correctly? (Verify 3: Fuel Pumps, Hub Bearings and Alternators)
-
Were sales floor items segregated one sku per peg hook? (Review 25 items total: wipers, bulbs, tools, high performance, towing/harness/ 5 each)
-
Were TM corrections on variance sheets accurate? (select 10 variance sheets)
-
Was PI SOP posted in the communication center?
-
Was the PI Checklist utilized to prepare for PI?
-
Were all assigned area tags accounted for?
-
Was the store prepped for PI?
-
Miscellaneous notes: