Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
-
Customer ID
Engineer checklist
-
Photo of Node open
-
Photo of Node with tray being labeled
-
Photo of Power test at node (With node label included)
-
Photo of fibre wrapped in tray with label
-
Photo of Hyperoptic label on the cable entry point
-
Photo of all rope left in chambers (Pls include pics with chamber reference)
-
Photo of Node strapped and secured
-
Photo of chamber left clean (inside)
-
Photo of chamber closed lid secured
-
Photo of cable coil test
-
Photo of cable coil left at customer property
-
How many chambers did you work on
-
Are there any specific challenges faced during the cabling work that need to be addressed?
-
How many meters of fiber cable were used for the underground cabling work?
-
Photo of rope left in all chambers
-
Photo of rope left in toby box (If applicable)
-
Was a55 submitted
-
CIV Reference number