Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Location
  • Customer ID

Engineer checklist

  • Photo of Node open

  • Photo of Node with tray being labeled

  • Photo of Power test at node (With node label included)

  • Photo of fibre wrapped in tray with label

  • Photo of Hyperoptic label on the cable entry point

  • Photo of all rope left in chambers (Pls include pics with chamber reference)

  • Photo of Node strapped and secured

  • Photo of chamber left clean (inside)

  • Photo of chamber closed lid secured

  • Photo of cable coil test

  • Photo of cable coil left at customer property

  • How many chambers did you work on

  • Are there any specific challenges faced during the cabling work that need to be addressed?

  • How many meters of fiber cable were used for the underground cabling work?

  • Photo of rope left in all chambers

  • Photo of rope left in toby box (If applicable)

  • Was a55 submitted

  • CIV Reference number

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.