Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
-
Contract Name:
-
Area Ref.:
-
System:
-
Drawing No:
Item
-
Anchor / fixing size(s) correct
-
Support type and size correct
-
Support spacing correct
-
Pipework routing as per drawing
-
(If No) Is drawing redlined?
-
Pipework size correct
-
Pipework materials correct
-
Pipework joints sound
-
Pipework welds sound
-
Welds stamped
-
Pipework expansion accounted for
-
Provision for venting pipework
-
Provision for draining pipework
-
Pipework painting complete
-
Pipework sleeves fitted
-
Pipework sleeves fire stopping fitted
-
Isolating valves installed as per drawing
-
Commissioning valves installed as per drawing and specification
-
Strainers fitted where required
-
Gauges installed correctly and damage free
Inspected by:
-
Operative/Sub-Contractor Signature:
-
Vital Energi Supervisor/Manager Signature:
-
Date and Time of Inspection: