Title Page
-
Site conducted
-
Project No.:
-
Contractor
-
Conducted On
-
Conducted By
-
Local Authority
Inspection Details
-
Stormwater Drainage System
-
Pipework has been visually inspected and is satisfactory
-
Gully pits and manholes have been visually inspected and are satisfactory
-
Gross Pollutant traps have been visually inspected and are satisfactory
-
"Water Valves" Check if valves is in correct location against approved plan/variation
-
Allotment Drainage
-
Concrete catch drains have been visually inspected and are satisfactory
-
Earthworks/Site Works
-
Sediment/erosion control measure maintained
-
All batter slopes stable and no distress exhibited
-
80% grass cover achieved
-
Street tree planting is satisfactory
-
Water Reticulation
-
No visible signs of trench subsidence
-
Valves and hydrants have been inspected and are satisfactory
-
Sewerage Reticulation
-
No visible signs of trench subsidence
-
Pipework has been visibly inspected and is satisfactory
-
Manholes/structures have been visually inspected and are satisfactory
-
Roadworks
-
Road pavement has been visually inspected and satisfactory
-
Kerb and channel has been visually inspected and is satisfactory
-
Linemarking and road signage satisfactory
-
Miscellaneous
-
Footpaths and concrete works satisfactory
-
Bikeways and associated works satisfactory
-
Street name signage satisfactory
-
Alternative pavement surfacing (eg pavers, stamped concrete) is satisfactory
-
Other Matters
-
Specific matters in relation to the site
Photos
-
Photos