Preliminary Waterproofing Inspection
-
Area Description
-
Add drawing
-
Application Method
-
Is the approved product being used?
-
Is all sheathing fabric completely bonded around opening?
-
Has all fabric been completely encapsulated in EnerShield?
-
Alpha Waterproofing Foreman
-
Shell McElroy QC
Window Installation Checklist
-
Select date
-
has the Preliminary Waterproofing Checklist been accepted?
-
Apply a generous bead of Urethane Sealant along the head and jambs of the exterior sheathing to bed the window flange in
-
Add media
-
Insert the window unit into opening and shim as needed to ensure that it is plumb and level
-
Install #10 x 1 1/2" Truss head screws through the nail flange of the unit and into the metal stud framing of the opening
-
Anchor Spacing: 10" from all corners and no more than 24" apart in field
-
Add media
-
Install window protection film
-
Add media
-
Shell McElroy Construction QC
-
Alpha Waterproofing Foreman
Final Window Flashing Installation
-
Select date
-
Has the window installation checklist been accepted?
-
Solvent wipe the aluminum frame and nail fin to receive the TF Membrane flashing
-
Install the TF Membrane flashing around the perimeter of the nail flange window and coat with EnerShield
-
Ensure that all TF Membrane has been fully encapsulated in EnerShield HP and no second coats are needed
Final Acceptance of 100% completed Window / Waterproofing Installation
-
Alpha Waterproofing Foreman
-
Shell McElroy Construction QC