Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Location

Untitled Page

1.0 Interior

  • Smoke Alarms Installed & Tested

  • Layout as per plan

  • Stairs / Balustrades / Handrails

  • F4 Openings - restrictors or barriers

  • Window / Door glazing safety glass stamp

  • Hot water supply available and as per plan

  • Hot water temperature

  • HWC source and type

  • HWC installation compliant

2.0 Roof Space

  • Roof space access

  • Ceiling insulation installed correctly

  • Fire walls stopped

  • Mechanical extracts vented to exterior

3.0 Bathrooms

  • Finished complete / impervious

  • All fixtures trapped / vented

  • Floor waste installed as per plan

  • Shower enclose compliant (silicone etc)

  • Ventilation

4.0 Kitchen

  • Finishes complete and impervious

  • Sink / Dishwasher trapped / Vented

  • Floor waste gulley if required

  • Rangehood installed and working

  • Hob clearance (if gas)

5.0 Laundry

  • Finishes complete and impervious

  • Floor waste gulley

  • Waste traps vented

  • Ventilation

  • Non-potable water signage

6.0 Exterior

  • Wall cladding integrity and type as per plan

  • Penetrations / junctions sealed and waterproof

  • Edges and underside of cladding painted

  • Windows and Doors weathertight

  • Vertical and horizontal control joints finished as per detail

  • Fire walls completed as per plan

  • Subfloor ventilation and access

  • Vermin proof

  • Finished ground level to floor clearances

  • Finished ground level to cladding clearances

  • Flashings complete and weathertight

  • External stairs / landing / handrails and barriers compliant

  • Driveway / paths and finished ground levels

7.0 Drainage

  • Cesspit locations and half siphon

  • ORG/Gulley installed correctly (haunched if required)

  • Backflow prevention if required

  • Non potable water signage

  • Tank type, location nd installation as per plan

8.0 Balcony & Deck

  • Size and layout as per plan

  • Cladding clearance from deck

  • Barrier as per plan

  • Fixings as per plan

  • Subfloor fixings correct and passed

  • Stairs / landings / handrail and barrier as per plan

9.0 Documentation

  • Elevations as per plans

  • All previous inspections updated and passed

  • All MV's updated and completed

10. General

  • Construction clean completed

  • Site clean completed

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.