Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
Untitled Page
1.0 Interior
-
Smoke Alarms Installed & Tested
-
Layout as per plan
-
Stairs / Balustrades / Handrails
-
F4 Openings - restrictors or barriers
-
Window / Door glazing safety glass stamp
-
Hot water supply available and as per plan
-
Hot water temperature
-
HWC source and type
-
HWC installation compliant
2.0 Roof Space
-
Roof space access
-
Ceiling insulation installed correctly
-
Fire walls stopped
-
Mechanical extracts vented to exterior
3.0 Bathrooms
-
Finished complete / impervious
-
All fixtures trapped / vented
-
Floor waste installed as per plan
-
Shower enclose compliant (silicone etc)
-
Ventilation
4.0 Kitchen
-
Finishes complete and impervious
-
Sink / Dishwasher trapped / Vented
-
Floor waste gulley if required
-
Rangehood installed and working
-
Hob clearance (if gas)
5.0 Laundry
-
Finishes complete and impervious
-
Floor waste gulley
-
Waste traps vented
-
Ventilation
-
Non-potable water signage
6.0 Exterior
-
Wall cladding integrity and type as per plan
-
Penetrations / junctions sealed and waterproof
-
Edges and underside of cladding painted
-
Windows and Doors weathertight
-
Vertical and horizontal control joints finished as per detail
-
Fire walls completed as per plan
-
Subfloor ventilation and access
-
Vermin proof
-
Finished ground level to floor clearances
-
Finished ground level to cladding clearances
-
Flashings complete and weathertight
-
External stairs / landing / handrails and barriers compliant
-
Driveway / paths and finished ground levels
7.0 Drainage
-
Cesspit locations and half siphon
-
ORG/Gulley installed correctly (haunched if required)
-
Backflow prevention if required
-
Non potable water signage
-
Tank type, location nd installation as per plan
8.0 Balcony & Deck
-
Size and layout as per plan
-
Cladding clearance from deck
-
Barrier as per plan
-
Fixings as per plan
-
Subfloor fixings correct and passed
-
Stairs / landings / handrail and barrier as per plan
9.0 Documentation
-
Elevations as per plans
-
All previous inspections updated and passed
-
All MV's updated and completed
10. General
-
Construction clean completed
-
Site clean completed