Information
-
Prepared by
-
Conducted on
-
CLIMBING AND LOWERING EQUIPMENT SAFETY CHECKS
-
Climbing Kit 1 lD
-
Date of last LoLer test
-
Date inspection due
-
Lowering kit 1lD
-
Date of last LoLer test
-
Date inspection due
-
Climbing Kit 2 lD
-
Date of last LoLer test
-
Date inspection due
-
Lowering kit 2 lD
-
Date of last LoLer test
-
Date inspection due
-
HAVE ALL DAILY CHECKS BEEN CARRIED OUT IN ACCORDANCE WITH THE MANUFACTURERS GUIDELINES?
-
WEEK ONE
-
Monday
-
Tuesday
-
Wednesday
-
Thursday
-
Friday
-
Add signature
-
WEEK TWO
-
Monday
-
Tuesday
-
Wednesday
-
Thursday
-
Friday
-
Add signature
-
WEEK 3
-
Monday
-
Tuesday
-
Wednesday
-
Thursday
-
Friday
-
Add signature
-
WEEK 4
-
Monday
-
Tuesday
-
Wednesday
-
Thursday
-
Friday
-
Add signature
-
Week 5
-
Monday
-
Tuesday
-
Wednesday
-
Thursday
-
Friday
-
Add signature
-
Faults/ Damage Report:
-
Has all faulty / damaged equipment been quarantined in a safe location?
-
Select date
-
Have all defects / faults and damaged equipment been reported to your line manager?
-
Select date
-
Have all previous faulty/ damaged equipment been replaced / repaired?
-
Select date
-
UPDATED LoLER RECORDS
-
New equipment added to LoLer record: Unique ID number and description:
-
Withdrawn Equipment: Unique ID number and description:
-
REPORT ALL FAULTS/ DAMAGE TO YOUR LINE MANAGER - DO NOT USE FAULTY OR DAMAGED EQUIPMENT / MACHINERY
-
I CONFIRM THAT ALL CLIMBING AND LIFTING EQUIPMENT OUTLINED ON THE ISSUED LoLER CERTIFICATE HAS BEEN INSPECTED AND IS FIT FOR USE- ALL DEFECTS HAVE BEEN RECORDED AND APPROPRIATE ACTIONS TAKEN FOR EQUIPMENT WITH DEFECTS. ALL WITHDRAWN AND NEW EQUIPMENT HAS BEEN AMENDED ON THE LoLER RECORD AND DETAILED ABOVE.
-
Team Leader Signature:
-
Select date