Title Page

  • Placing boom and Tower Installation- tower location within project if more than one

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Engineering-Placing Boom and Tower

  • Estimated tower installation

  • Duration of tower on project in months

  • Is there engineered drawings for install

  • Estimated total yardage

  • Anticipated pump unit

  • Boom size

  • Boom configuration

  • Add pictures

  • Tower configuration

  • Add pictures

  • Tower height in feet

  • Foundation configuration

  • Form Attachment

  • Add media

System-Placing Boom

  • Add placing system pictures

  • Horizontal pipe length

  • Add media

  • Vertical pipe height

  • Add media

  • Diversion valve

  • Add media

  • Blow out stand

  • Add media

  • Blow out caps inspected and on site

Initial torque and inspection

  • Foundation bolts

  • To what value and location

  • Tower bolts

  • To what value

  • Corner details

  • Add media

  • Cross frame

  • To what values

  • Pedestal secured and pinned

  • Power Cords secured and in good condition

  • Radio remote - faceplate legible and in good working condition

  • Hard wire remote - faceplate legible and in good working condition

  • Battery charger and Spare remote batteries - in good working condition

  • Final functions test

  • Notes on final test

  • Signature of auditor

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.