Title Page

  • Conducted on

  • Prepared by

  • Location
  • Add location
  • Enter Time and date

Shredder 1

  • Have you used mirror to check the charge box is empty?

  • Has the shredder been switched off and isolated?

  • Safely disconnect safety switch from panel and remove panel.

  • Check for foreign objects and remove. (Provide pictorial information of foreign objects found)

  • Confirm Classifier safely cleaned (remove classifier if needed using bolts and FLT support)

  • Check Number of teeth which had to be turned

  • Confirm number of teeth replaced

  • Confirm Number of teeth left in stock .

  • Confirm Number of teeth left in stock .

  • Confirm status of Counter Knives (Confirm with Pictures)

  • Confirm Stock of counter knives in place (Send action if replacement order required)

  • Check for any signs of damage on Ram and confirm details ( Take image)

  • Has all items been re-assembled and tested to ensure it is working?

Shredder 2

  • Confirm Charge box is empty using mirror ?

  • Has the shredder been isolated

  • Has the water been switched to Augur feed?

  • Has the Augur feed line been switched off and isolated?

  • Remove guard and clean/empty Augur hopper and check for foreign objects or damage to Augur feed screws (Confirm with Pictures)

  • Has the feed in conveyor been cleaned and belt in good order (Confirm with Picture)

  • Safely disconnect safety switch from panel and remove panel.

  • Confirm Classifier safely cleaned (remove classifier if needed using bolts and FLT support)

  • Check Number of teeth which had to be turned

  • Confirm Number of teeth left in stock .

  • Confirm status of Counter Knives (Confirm with Pictures)

  • Confirm Stock of counter knives in place (Send action if replacement order required)

  • Check for any signs of damage on Ram and confirm details ( Take image)

  • Has all items been re-assembled and tested to ensure it is working? Including Augur and water feed

Float Sink Tank

  • Have all the water inlets to the tank been switched off

  • Have all the motors been switched off and locked off including Augur screws and paddles?

  • Is the motor set up on the sump drain ready to discharge

  • Has the sump drain been opened?

  • Take picture of fill of waste in tank

  • Has the tank been emptied of waste? ( Confirm with Picture(s))

  • Confirm number of tipping buckets removed from Tank

  • Confirm sink float tank rota screws are operational?

  • Have IBC water tanks been emptied and hoses are back in place

  • Confirm IBC tank Filter bag has been cleaned and emptied

  • Confirm IBC tank pumps operational

  • Confirm Close of sump drain and begin refill of tank

Granulator

  • Confirm Granulator fan is switched off

  • Confirm Granulator switched of and locked off

  • Confirm clean out of granulator drop box of all fiber and loose material ( Take Picture). Ensure all holes are free and slide drops clear)

  • Confirm Use of movable ladder to confirm cyclone box is clear and free from fiber ( May need to remove bottom drop hose to check)

  • Has the ibc under cyclone stack been emptied? ( confirm with picture)

  • Confirm Check of teeth on Granulator

  • Confirm number of teeth turned

  • Confirm Number of teeth replaced

  • Confirm number of teeth left in stock and action re-order

  • Has waste spillage under feed conveyor been cleaned? ( Confirm with picture(s)

  • Confirm movement of conveyor wheels are moving freely and free from waste?

  • Has drop IBC from Float Sink tank to conveyor been emptied and cleaned with all Pumps and pipes back in place? ( Confirm with Picture)

Caustic Wash

  • Has the Caustic Tank been switched off and isolated?

  • Has the in-feed Augur been switched off?

  • Has the in-feed Augur been switched off?

  • Has the infeed Augur been switched off?

  • Has the sediment been removed from the tank? ( Confirm with Picture(s))

  • Confirm Number of tipping skips filled from the dig out and disposed of

  • Confirm tank paddles are operational

  • Has the tank been set to refill ensuring discharge valve is closed?

  • Have the additives been added back to the tank ?

  • Confirm stock levels of additives and action re-order if required

BOSS Unit

  • Has the input feed been removed? (Stand in safe location

  • Confirm Boss has been run off (i.e all plastics have been emptied out of Boss)

  • Confirm switch off from main control Panel (CD)

  • Has all the floating scum been removed from the outlet tank using "Fishing net" ( Confirm with pictures)

  • Confirm Drain of Boss Water Tank( Confirm level of residue left with Picture)

  • Confirm Main Boss unit has been drained? ( Confirm with Picture)

  • Confirm Clean of sides of water tank of residues ( Confirm Picture)

  • Enter tank and remove waste when drained ( Confirm With Picture)

  • Has Boss been stripped using SWP/RA

  • Has the Boss unit been removed with FLT and jetted down next to Plastic Pile ( Remove Jacket/Cover) ( Confirm with Picture)

  • Has Boss unit been re-assembled including cover/jacket and re-attached?

  • Confirm Boss unit has been jet washed and reassembled?

  • Has drain been switched off and Boss been refilled with water ?

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.