Title Page
-
Fleet No
-
Plant Image
-
Engine Hours
-
Conducted on
-
Prepared by
-
Depot / Site Address
-
Instructions
1. Start by choosing the time of inspection then answer "✔", "✖", “N/A” on the items provided.
2. Tap on Notes or Image under each question to add evidences.
3. To add a Corrective Action, tap on "Action", provide a description, assign to a member, set priority and due date.
4. Complete audit by providing digital signature.
5. Share your report by exporting as PDF, Word, Excel or Web Link. -
Choose timing of inspection
- Daily Pre-Use Checks
- Weekly Checks
DAILY PRE-USE CHECKS
-
Engine Oil Level
-
Fuel Level/Leaks
-
Coolant Level
-
Hydraulic: Oil Level
-
Hydraulic System Leaks
-
Grease Attachments
-
Grease Base Machine
-
Inspect Seat Belts
-
Inspect for Cracks
-
Check Operation of all Switches
-
Check Operation of Console
-
Inspect Bucket/Attachment
-
Check Operation of SLI
-
Window Damage
-
Cab Condition
-
Check of Vandal Damage
-
Tyre Pressures
Sign Off
-
Operator's Comments
-
Were any Defects found?
-
Operator (Name & Signature)
-
Operation Management (Name & Signature)
WEEKLY CHECKS
-
A. Battery & Water Level
-
B. Windscreen Reservoir
-
C. Lub Machine
-
D.Transmission Levels
-
E. Drain Fuel Sediment Bow
-
F. Drain Fuel Tank of Water
-
G. Check Fan Belt
-
H. Check A/C Belt
-
I. Check Track Tension
-
J. Check for Loose Track Plates
-
K. Slew Motor Oil Level
-
L. Tyre Condition
-
M. Bucket & Dipper Arm Pins
Equipment with Machine (tick box)
-
WEEKLY SAFETY INSPECTIONS (delete where required)
The plant has been Thoroughly Examined as required by LOLER
The operator must also inspect the plant before use on a new site and every week thereafter as required by PUWER
Please report results below. -
Buckets
-
Size (if applicable)
-
Good Working Order
-
Vandal Guards
-
Size (if applicable)
-
Good Working Order
-
Quick Hitch
-
Size (if applicable)
-
Good Working Order
-
Lifting Eye
-
Size (if applicable)
-
Good Working Order
RESULTS OF ASLI INSPECTION (where fitted)
-
Boom
-
Radius
-
SWL
-
Correct Operation
CAB Certificates
-
Thorough Examination Certificate 6/12 Monthly
-
ASLI Manual
-
Operator's Manual
-
Data Logger
Repairs Completed or Comments
-
Details
Sign Off
-
Fitter (Name & Signature)
-
Operation Management (Name & Signature)