Title Page
-
Site conducted
-
Audit type
-
Plot Number
-
Block
-
Conducted on
General
-
Is the pipe work PVC manifold or copper brazing works
-
Take a picture of manifold location
-
Enter drawing number and revision
Heating/Hot and Cold pipe works
-
Has all pipe work been clipped and secured correctly
-
Reason why
-
Take A photo
-
Take picture
-
Has all pipe work been clipped and secured correctly
-
Is the installation of heating services to Radiator locations complete
-
Reason why
-
Take A photo
-
Take picture
-
Is the installation of Hot water services to Bathroom(s) / Kitchen complete
-
Reason why
-
Take A photo
-
Take picture
-
Is the installation of cold water services to Bathroom(s) / Washing machine /Kitchen complete
-
Reason why
-
Take A photo
-
Take picture
-
Has all the radiator outlets been installed in the correct locations as per drawings- installed 500mm FFL
-
Reason why
-
Take A photo
-
Take picture
-
Has all the pipe work been lagged
-
Take A photo showing missing lagging
-
Take pictures of installed lagging
-
Has Non-combustible fixings been installed in the protected corridors - within every 1000mm and 300mm where penetrates protected wall in corridor (either side)
-
Reason why
-
Take A photo
-
Take Picture
-
Has all pipework been clipped maximum of every 500mm all locations
-
Reason why
-
Take A photo
-
Take Picture
-
HIU first fix rail installation complete
-
Reason why
-
Take A photo
-
Take a picture
-
Bathroom(s) Cistern installation complete if applicable
-
Reason cannot be complete
-
Take A photo showing incomplete works
-
Take a picture
-
Bathroom(s)Shower pipes installed 150mm apart , 1200mm from FFL where applicable as per drawing
-
Reason why
-
Take A photo
-
Take a picture
-
Pipework in external walls installed with copper pipe
-
Reason why
-
Take A photo
-
Take a picture
Sign off
-
Name of engineer(s) who completed the works
-
date of completion of works
-
I/We sign to say we have checked the above plot and the above results are correct at the time of inspection