Title Page

  • Site conducted

  • Plot Number

  • Block

  • Conducted on

General

  • Is all pipework as per spec

  • Is the pipe work to manifold correct I.e correct zones

  • Enter drawing number and revision

Heating/Hot and Cold pipe works

  • Has all pipe work been clipped and secured correctly

  • Is the installation of heating services to Radiator locations complete

  • Is the bathroom mid fix complete

  • Is the En-suite mid fix complete

  • Is the installation of hot & cold water services and waste to kitchen ready for mid fix

  • Has all the radiator outlets been installed in the correct locations as per drawings- installed 500mm FFL

  • Has all the pipe work been lagged

  • Has Non-combustible fixings been installed in the protected corridors - within every 1000mm and 500mm where penetrates protected wall in corridor (either side)

  • Has all pipework been clipped maximum of every 1000mm all locations

  • HIU first fix rail installation complete

  • Bathroom(s) Cistern installation complete if applicable

  • Pipework in external walls installed with copper pipe

  • Is all Lagging complete

  • lagging cut back both side of walls for fire seal

  • is all hot and cold pipe work checked and tested

  • is all Heating Flow & return pipe work checked and tested

Sign off

  • Name of engineer(s) who completed the works

  • date of completion of works

  • I/We sign to say we have checked the above plot and the above results are correct at the time of inspection

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.