Title Page
-
Site conducted
-
Audi type
-
Plot Number
-
Block
-
Conducted on
First Fix SVP QA
Details
Cylinder cupboard checks
-
Cylinder installed and accessible for future maintenance
-
Hot supply lagged
-
Washing machine feed installed with double check valve
-
All waste work complete and tested
-
Cylinder commissioned
-
Cylinder serial number
Kitchen
-
Kitchen tap and waste installed
-
Waste and overflow been checked for leaks
-
Hot water temp
-
Hot water flow
-
Cold water flow
-
Dishwasher feed installed with double check valve
-
How and cold feed correct (not crossed)
Bathroom
-
Toilet installed with seat and flush button
-
Basin, basin tap& waste installed
-
Basin flow
-
Bath 3 way control installed and working correctly
-
Bath temp at safety level (36-38)
-
Bath temp at the full
-
Shower outlet installed
-
Shower over head installed
En-suite
-
Toilet in stalled with feat and flush button
-
Basin, basin tap& waste installed
-
Basin flow rate
-
Shower 2 way control installed and working correctly
-
Shower temp at safety level (36-38)
-
Shower temp on full
-
Shower outlet installed
-
Shower over head installed
Managers sign off
-
Name of engineer who installed the works
-
Date the works were completed
-
I/we sign to say we have checked the above plot and the results are correct at time of inspection