Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Location

Mechanical 1st FIX

  • Pipe and fittings comply with Specification

  • 1st fix installed as per drawing

  • Bathroom pre-plumb complete and setting out correct

  • Kitchen pre-plumb done

  • All radiator tails out in correct location

  • Hiu pipe setting correct

  • All pipe work tested to manufacturers Specification

  • All pipe work lagged

  • All waste pipes extended with correct full, ready for 2nd fix

  • All open ends taped up

  • Plot clean and clear of all materials

  • Note any issues here

Completion Sign Off

  • Checked By MBS

  • Name

Client Sign Off

  • Checked by Client

  • Name

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.