Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Location
  • System Inspected

Untitled Page

  • Is kitchen Pre plumb installed as per drawing

  • Is kitchen Pre plumb complete ready for kitchen fitter

  • If yes are all open ends taped up

Bathroom/En-suite

  • Is bath installed and level ready for tiler

  • Is bath protected from other trade's work

  • Is shower tray installed and level ready for tiler

  • Is the shower tray recessed into the wall as per SPEC

  • Is Shower Tray protected from other trade's work

  • Name

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.