Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
-
System Inspected
Untitled Page
-
Is kitchen Pre plumb installed as per drawing
-
Is kitchen Pre plumb complete ready for kitchen fitter
-
If yes are all open ends taped up
Bathroom/En-suite
-
Is bath installed and level ready for tiler
-
Is bath protected from other trade's work
-
Is shower tray installed and level ready for tiler
-
Is the shower tray recessed into the wall as per SPEC
-
Is Shower Tray protected from other trade's work
-
Name