Title Page
-
Site conducted
-
Audi type
-
Plot Number
-
Block
-
Conducted on
First Fix SVP QA
Details
-
List the drawing numbers are Rev installed too
Our SVP Installation
-
Is all Pipe work installed and complete
-
What is not complete and why
-
Take a picture
-
Take pictures
-
Expansion couplers installed as per schematic
-
What is not complete and why
-
Take a picture
-
Take pictures
-
Has kitchen Stack with 40mm branch and access at 1200mm FFL installed
-
What is not complete and why
-
Take a picture
-
Take pictures
-
Bathroom Stack installed with 110mm w/c waste, 40mm basin waste and 40mm bath waste and access at 1200mm FFl installed
-
What is not complete and why
-
Take a picture
-
Take pictures
-
Fire collars fitted where pipe passes through fire break
-
Reason for them not being installed
-
Take a picture
-
Take pictures
-
Any stub stack fitted with AAV 1000mm from FFL
-
Why have these not been installed
-
Take a picture
-
take pictures
-
Waste pipes for kitchen installed above 200mm FFL?
-
Why have these not been installed
-
Take a picture
-
Take pictures
-
Waste pipes for HIU & Washing machine fitted above 200mm from FFL
-
Why have these not been installed
-
Take a picture
-
Take pictures
-
Internal rain water pipes installed
-
Why have these not been installed
-
Take a picture
-
Take pictures
-
High level change of direction installed with acoustic pipe
-
Why have these not been installed
-
Take a picture
-
Take pictures
Managers sign off
-
Name of engineer who installed the works
-
Date the works were completed
-
I/we sign to say we have checked the above plot and the results are correct at time of inspection