Information
-
Plumbing Inspection - Water in Walls (Hot & Cold)
-
Conducted on:
-
Prepared by
-
Address:
-
Plumbing Approval Number:
-
Inspection Notes:
-
Deemed to Comply
-
Materials used are approved and appropriately marked?
-
Hot to the left and Cold to the right?
-
Tempering valves installed? Bathroom fixtures reach a maximum of 50 degrees centigrade?
-
The correct piping is used?
-
Pipe work is labelled appropriately?
-
Pipe sizing:
-
15mm 3 meters
-
18mm 6 meters
-
20mm thereafter
-
Securing pipe work (polymer pipe work) at every truss or 600mm max on horizontal?
-
Pressure test 1500 Kpa?
Inspection Outcome
-
Inspection Result