Information

  • Plumbing Inspection - Water in Walls (Hot & Cold)

  • Conducted on:

  • Prepared by

  • Address:
  • Plumbing Approval Number:

  • Inspection Notes:

  • Deemed to Comply

  • Materials used are approved and appropriately marked?

  • Hot to the left and Cold to the right?

  • Tempering valves installed? Bathroom fixtures reach a maximum of 50 degrees centigrade?

  • The correct piping is used?

  • Pipe work is labelled appropriately?

  • Pipe sizing:

  • 15mm 3 meters

  • 18mm 6 meters

  • 20mm thereafter

  • Securing pipe work (polymer pipe work) at every truss or 600mm max on horizontal?

  • Pressure test 1500 Kpa?

Inspection Outcome

  • Inspection Result

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.