Title Page

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Health Check

  • Comments on customer offer

  • Instock result

Scope review

  • Has the scope been fully delivered?

  • Details

  • Was PC achieved?

  • Which suppliers/contractors impacted?

Design Drawings

  • Has the CAD been delivered to the agreed drawing?

  • Has the as built CAD been uploaded to portal?

Project Handover

  • Has FMSS handover taken place (including refrigeration handover)?

Two Part Snagging and Extras list

  • Has all the snagging been completed?

  • Outstanding Snag
  • Add media

  • Have all the extras been completed?

  • Outstanding Snag
  • Add media

  • Is the store defect free (associated construction items)?

  • Outstanding Snag
  • Add media

Post launch maintenance call outs

  • Has there been any maintenance call outs since launch?

  • How many?

  • Do they relate to fit out works?

  • Details

Lessons learned

  • On a scale of 1-10 where 1 is largely disagree and 10 is totally agree, how would you rate the following?

  • I was given satisfactory notice of the works

  • Comments

  • I was consulted about the scheme during the process

  • Comments

  • Any issues I raised was dealt with to my satisfaction

  • Comments

  • I was given satisfactory notice of the works

  • Comments

  • The contractors operated in a respectful manner

  • Comments

  • Business disruption was kept to a minimum

  • Comments

  • The site was handed over daily clean and safe

  • Comments

  • The works met my expectations

  • Comments

  • Overall I was very happy with the service from the estates team during the works

  • Comments

  • Overall I was very happy with the service from the RPM / CM

  • Comments

  • Overall I was very with the service from the project support co-ordinator

  • Comments

  • The briefing pack was a useful tool to support during the fit out

  • Comments

  • The retail POW reflected the construction programme

  • Comments

  • The project detail was provided in a clear and informative manner.

  • Comments

  • Customer availability is at an acceptable level

  • Comments

  • Legacy stock has been cleared to an acceptable level

  • Comments

  • Operations fully supported during the fit out

  • Have there been any customer accidents related to the fit-out

  • Have there been any colleague accidents related to the fit out

  • Have there been any near misses related to the fit out

  • Are all fire extinguishers in place with signage

  • Has the health and safety file been left at store (PSC to check office and have vision of file)

  • Any other comments or findings that can assist estates services on improving?

Sign off

  • Add signature

Photographs

  • Add media

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.