Title Page

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Details

  • Construction manager

  • Regional acquisitions manager

  • Latest asset plan reference

  • Developers PC date

  • Fit out start on site date

  • Launch date

  • Last visit date

  • Next visit date

Progress, programme & status

Utilities progress & status

  • Power upgrade required?

  • MPAN & CT ratio?

  • Main head installed

  • Install date?

  • Meter installed?

  • Install date?

  • Comments

  • Mains Water Installed?

  • Install date?

  • BT Openreach (20 Pair) installed into building?

  • BT new site reference?

  • Proposed date for developer ducts to be completed?

  • Details

  • Way leaves and easements required?

  • Details?

  • Date?

Shell Survey

  • Site measure on completion of external walls complete?

  • Measured survey completed?

  • Shell overlay provided to asset planning?

Shell Planning conditions

  • Pre commencement and preoccupation conditions discharge?

  • Noise and plant restrictions?

  • Delivery restrictions?

  • Opening hours restrictions?

  • Other comments?

Minor works planning applications

  • Plant application required?

  • Signage application required?

  • ATM application required?

  • Shopfront and elevations application required?

  • Has the CM issued the minor works applications to the shell monitor?

  • Details, comments

Current drawings and Shell Spec

  • Does the current drawing reflect the base build? (if no detail changes)

  • Details

  • Photo

Shell spec conformity

  • Asbestos R&D survey?

  • Roof (plant loadings)?

  • Info

  • Walls (internal and external finishes, service apertures)?

  • Info

  • Floor slab (finish, recess position and sizes, 100mm, matwell, external levels)?

  • Info

  • Drainage, pop-up locations, setting out and quantity in relation to asset plan?

  • Info

  • Column positions, setting out and quantity in relation to asset plan?

  • Info

  • Ceiling, internal storey height?

  • Info

  • Acoustic ceilings?

  • Info

  • Fire protection steelwork and columns?

  • Info

  • Lift Installed?

  • Info

  • ATM setting out?

  • Info

  • Bollard protection, ATM & Shopfront protection?

  • Info

  • Auto door and shopfront?

  • Info

  • Roller shutters?

  • Info

  • Goods in door?

  • Info

  • MOE doors?

  • Info

  • Thresholds?

  • Info

  • Car park (Whitelining, lighting, signage and shared car parking)?

  • Info

  • Delivery access and levels?

  • Info

  • Boundaries and landscaping?

  • Info

  • Building inspector reports and visits?

Conclusions

  • Site security update

  • General notes

  • Risks

  • Actions

Distribution

  • Pre-Construction

  • RAM

  • CM

  • Fit-Out contractor

  • DM

Progress Photos

    Photos
  • Add media

Sign off

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.