Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
VIN (LAST 8)
-
IS OPERATOR SIGNED OFF TO COMPLETE TASK?
-
IS ALL PPE REQUIRED (AS PER WORK INSTRUCTION) AVAILABLE & IN GOOD CONDITION?
-
ARE ALL TOOLS REQUIRED (AS PER WORK INSTRUCTION) AVAILABLE & IN A GOOD CONDITION?
-
HAS THE OPERATOR CORRECTLY FOLLOWED THE FITMENT INSTRUCTIONS?
-
ARE ALL PANELS FITTED CORRECTLY?
-
ARE ALL PANELS IN GOOD CONDITION?
-
DO THE PANEL COLOURS MATCH?
-
IS THE VEHICLE CLEAR OF DEBRIS/MESS POST FITMENT?
-
IS THE VEHICLE FREE OF DAMAGE POST FITMENT?