Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Licence number
-
Location
-
PASS OR FAIL
-
Building number
Untitled Page
-
Is the UPS operational
-
Cleaning of UPS including fans.
-
Mechanical condition check.
-
Check of physical / electrical connections between battery cells.
-
Functional test of all UPS assemblies such as rectifiers, inverters, static switches, and manual bypass
-
Check of UPS output and load distribution across phase(s).
-
Functional check of UPS monitoring and indication devices.
-
Test of UPS system by simulating mains failure (if possible).
-
Voltage per minute over five minutes
-
UPS model