Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Licence number

  • Location
  • PASS OR FAIL

  • Building number

Untitled Page

  • Is the UPS operational

  • Cleaning of UPS including fans.

  • Mechanical condition check.

  • Check of physical / electrical connections between battery cells.

  • Functional test of all UPS assemblies such as rectifiers, inverters, static switches, and manual bypass

  • Check of UPS output and load distribution across phase(s).

  • Functional check of UPS monitoring and indication devices.

  • Test of UPS system by simulating mains failure (if possible).

  • Voltage per minute over five minutes

  • UPS model

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.