Title Page
-
Document No.
-
PM Building Checks
-
Conducted on
-
Completed by & Job Description
-
Places Gym Chestefield
Places Gym Chesterfield - These checks are to be completed on a daily basis. If there is any non conforming items a picture must be taken at the end of this report, and then logged in the Corrective Action Log located within #DM Folder located on the Shared Drive.
Daily PM Building Checks
-
Check that all PM cleaning around the facility has been completed
-
Check that all setups are completed for the following morning
-
Turn off centre TV’s and audio systems
-
Send the End of Shift Report to all managers
-
Ensure all keys have been returned and Key Safe is locked
-
Turn Off All Computer Screens
-
Check that all radios are on charge overnight
-
Check that the DM phone has been placed on charge
-
Cash up last receptionist
-
Check all floats are counted and that the safe room is secured
-
Check all Fire Exits are secure
-
Check that all areas of the facility are free from public
-
Final External building check
-
Turn off all remaining centre lights
-
Set the Intruder alarm and lock the entry door
-
Car park visual inspection
Additional Information
-
Select date
-
Duty Manager Signature confirming completion