Information

  • Audit Title

  • Prepared by

  • Location

Routine Visual Inspection Checklist

Daily Inspection Instruction

  • Approved on-site personnel are to complete daily inspection of the trestle at the beginning of every day shift. If any item is non-compliant, a copy of the checklist must be sent to KECo for review. File the completed checklist in the permanent record.

  • Weather

Rail

  • Handrail free of damage

  • Guardrail free of damage

Decking

  • Clear of ice, snow, mud, dirt, and debris.

  • Overlay free of damage & major wear.

Approaches

  • No erosion / rock slope maintained.

  • Free of potholes.

Concrete Abutment

  • No movement

  • Free of cracking and spalling

Piers

  • No ice build-up

  • No evidence of impact or damage

  • X-Bracing / Turnbuckles Connected

  • No change in noticeable vibrations

Trestle Performance

  • No change in ride performance

  • No change in deck deflections under load

  • No change in pier deflections under load

Spillway pool and shelf

  • Water level ok

  • Ice condition good

  • No evidence of ice block / sheet movement

  • No discharge of ice through spillway gates

Inspector

  • Signature

  • Select date

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.