Information
-
Knight to Bowers Pipeline Project
-
Township, County
-
Category 3 Permit#
-
Ch.105 Permit #
-
Permit number:
-
Conducted on
-
Location
-
One month review
-
Full growing season review
-
Is crossing stabilized?
-
Has grading been restored to pre-construction conditions
-
Were trench plugs installed as per the permitted drawings?
-
Has excess fill material been removed?
-
Have erosion and sedimentation controls been removed?
-
Have the permitted plantings been completed?
-
What is the current overall condition of plantings(hydrophytic vegetation)<br>
-
Additional observations or comments
-
Inspector signature
-
Add media