Title Page
Post work check
-
Post work check to confirm compliance with Gas safety standards and RMPFS ltd safety management system
-
Conducted on
-
Office Name
-
Address
-
Prepared by
-
GasSafe Registration No.
-
RMPFS Job No.
-
Job Description
-
Date work was completed
-
Select date
-
Direct Labour or Subcontractor?
-
Subcontractor registration No.
-
GasSaferegistration No., of operative carrying out work on behalf of the subcontractor
-
GasSafeRegister Licence No.
Site
-
Have YOU consulted with the PIC to let him/her know why you're there and to find out any hazards or issues that may interfere with your visit?
-
Is the Site Log available?
-
Action to PIC to ensure that the SLB is available at all times, or action to RMG to supply a new or replacement SLB
-
Have YOU consulted the safe systems of work for the areas and conditions under which the Post check is taking place?
-
Why not?
-
What, if any SSOWs will be consulted to ensure safety in the work area?
General competence
-
Are those who worked (are working) on the job under check correctly registered with GasSafeRegister for the work being undertaken? <br>Or under the direct supervision of one who is?
-
Issue an action to the line manager to contact planning to prevent this happening again. Action to engineer to explain why? If a subcontractor: Action to subcontractor seeking an explanation action to Purchasing to prevent further use of this subcontractor pending investigation. Action to YOU to postcheck some previous jobs
-
Is there evidence in the site log for the work being checked?
-
Issue a reminder to the manager that signing into the site log is Mandatory.
-
Is the work site acceptably clean and tidy?
-
Is there any waste from the job left on site?
-
Issue an action to the engineer and manager or to subcontractor to get this disposed of correctly.
Certification
-
Is certificate for the work available on CRD
-
Contact line manager by email and issue action to chase this failure
-
Has the work documentation (Electronic or hard copy) been completed to a satisfactory standard?
-
Detail defects in documentation, then issue action to engineer / line manager to amend or re-issue certificate.
-
Has any remedial work been carried out?
-
Has the remedial work been carried out to a satisfactory standard?
-
Issue action to make good this deficiency
-
Are there any Gas Safety situations noted or referred to on the certificate under check?
-
Has the ID procedure been carried through correctly?
-
Detail deficiencies and remedial action required and taken
-
Has the AR procedure been carried through correctly?
-
Detail deficiencies and remedial action required and taken
Gas Safety
-
Is the ventilation sufficient and correctly placed?
-
Issue an action to the engineer and manager to get this dealt with correctly.
-
Are any installed interlocks operating correctly?
-
Issue an action to the engineer and manager to get this dealt with correctly.
-
Are the provisions for flueing, i.e. Condition, route, termination, fixings, and performance satisfactory?
-
Issue an action to the engineer and manager to get this dealt with correctly.
-
Are safety controls and operational controls functional?
-
It may be necessary to take action under the GIUSP / IGEM/UP/11
-
Detail defects and any actions taken in response (ID/AR remedials etc.)
-
Details of any safety control not checked.
-
Is (are) the associated pipework, materials, fixings, and valves installed correctly?
-
Issue an action to the engineer and manager to get this corrected.
-
Are there any gas leaks at disturbed joints?
-
Detail defects, repair if possible otherwise act for safety.
-
Flue gas analysis required?
-
Input analysis results
-
Are there any Gas unsafe situations existing at the work site?
-
Details and remedial actions taken
-
Helpdesk incident No
-
Gas emergency No.
-
Is this likely to be a RIDDOR re portable incident under the gas regulations?
-
Make the appliance or system safe without disturbing it, if possible take photographic evidence of the relevant areas of concern.
Contact:
RMPFS line manager for the building
PIC for the building -
Details of defects and of actions taken.
-
Helpdesk incident No.
-
Has the appliance or installation been left in a safe condition and functioning correctly?
-
Issue an action to the engineer and manager or sub contractor informing him of the defects and if necessary make safe using the GIUSP / IGEM/UP/11 procedures..
Summary and Sign off
Summary and sign off.
-
Are there any exclusions, limitations or comments to this report?
-
Details here
-
Signed
-
Select date