Title Page

Post work check

  • Post work check to confirm compliance with Gas safety standards and RMPFS ltd safety management system

  • Conducted on

  • Office Name

  • Address
  • Prepared by

  • GasSafe Registration No.

  • RMPFS Job No.

  • Job Description

  • Date work was completed

  • Select date

  • Direct Labour or Subcontractor?

  • Subcontractor registration No.

  • GasSaferegistration No., of operative carrying out work on behalf of the subcontractor

  • GasSafeRegister Licence No.

Site

  • Have YOU consulted with the PIC to let him/her know why you're there and to find out any hazards or issues that may interfere with your visit?

  • Is the Site Log available?

  • Action to PIC to ensure that the SLB is available at all times, or action to RMG to supply a new or replacement SLB

  • Have YOU consulted the safe systems of work for the areas and conditions under which the Post check is taking place?

  • Why not?

  • What, if any SSOWs will be consulted to ensure safety in the work area?

General competence

  • Are those who worked (are working) on the job under check correctly registered with GasSafeRegister for the work being undertaken? <br>Or under the direct supervision of one who is?

  • Issue an action to the line manager to contact planning to prevent this happening again. Action to engineer to explain why? If a subcontractor: Action to subcontractor seeking an explanation action to Purchasing to prevent further use of this subcontractor pending investigation. Action to YOU to postcheck some previous jobs

  • Is there evidence in the site log for the work being checked?

  • Issue a reminder to the manager that signing into the site log is Mandatory.

  • Is the work site acceptably clean and tidy?

  • Is there any waste from the job left on site?

  • Issue an action to the engineer and manager or to subcontractor to get this disposed of correctly.

Certification

  • Is certificate for the work available on CRD

  • Contact line manager by email and issue action to chase this failure

  • Has the work documentation (Electronic or hard copy) been completed to a satisfactory standard?

  • Detail defects in documentation, then issue action to engineer / line manager to amend or re-issue certificate.

  • Has any remedial work been carried out?

  • Has the remedial work been carried out to a satisfactory standard?

  • Issue action to make good this deficiency

  • Are there any Gas Safety situations noted or referred to on the certificate under check?

  • Has the ID procedure been carried through correctly?

  • Detail deficiencies and remedial action required and taken

  • Has the AR procedure been carried through correctly?

  • Detail deficiencies and remedial action required and taken

Gas Safety

  • Is the ventilation sufficient and correctly placed?

  • Issue an action to the engineer and manager to get this dealt with correctly.

  • Are any installed interlocks operating correctly?

  • Issue an action to the engineer and manager to get this dealt with correctly.

  • Are the provisions for flueing, i.e. Condition, route, termination, fixings, and performance satisfactory?

  • Issue an action to the engineer and manager to get this dealt with correctly.

  • Are safety controls and operational controls functional?

  • It may be necessary to take action under the GIUSP / IGEM/UP/11

  • Detail defects and any actions taken in response (ID/AR remedials etc.)

  • Details of any safety control not checked.

  • Is (are) the associated pipework, materials, fixings, and valves installed correctly?

  • Issue an action to the engineer and manager to get this corrected.

  • Are there any gas leaks at disturbed joints?

  • Detail defects, repair if possible otherwise act for safety.

  • Flue gas analysis required?

  • Input analysis results

  • Are there any Gas unsafe situations existing at the work site?

  • Details and remedial actions taken

  • Helpdesk incident No

  • Gas emergency No.

  • Is this likely to be a RIDDOR re portable incident under the gas regulations?

  • Make the appliance or system safe without disturbing it, if possible take photographic evidence of the relevant areas of concern.
    Contact:
    RMPFS line manager for the building
    PIC for the building

  • Details of defects and of actions taken.

  • Helpdesk incident No.

  • Has the appliance or installation been left in a safe condition and functioning correctly?

  • Issue an action to the engineer and manager or sub contractor informing him of the defects and if necessary make safe using the GIUSP / IGEM/UP/11 procedures..

Summary and Sign off

Summary and sign off.

  • Are there any exclusions, limitations or comments to this report?

  • Details here

  • Signed

  • Select date

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.