Information
-
Job number
-
Location
-
Client / Job Number / Panel Number
-
Bed Number
-
Panel Thickness
-
Conducted on
-
Prepared by
Check all boxes below with the shop drawing before ticking panel for storage.
-
Are all dimensions as per shop drawing?
-
Are the diagonals as per shop drawing?
-
Are all lifting devices in place before lifting as per shop drawing?
-
Is a strong back required for lifting as per shop drawing?
-
Are all blockouts and penetrations in the correct position as per shop drawing?
-
Are all near face ferrules installed correctly as per shop drawing?
-
Are all far face ferrules installed correctly as per shop drawing?
-
Are all fillet lines in the correct position as per shop drawing?
-
Are all cast in plates and angles in the correct position as per shop drawing?
-
Are all rebates in the correct position as per shop drawing?
-
Is the panel finish to a class 2 finish?
-
Has all patching and rework been completed to a satisfactory standard?
-
Has the panel been inspected and ticked off ready for storage?
-
Is the panel marked correctly ie. date/ job number/panel weight etc?
-
Has adequate protection been provided to prevent panel damage whilst in storage? Ie. dun age positioned between pins and the panel?
I have undertaken a review of the above processes and have approved this panel for transport.
-