Title Page
-
Project Name:
-
Project No.
-
Slab Level:
-
Pour Number:
-
Select date
-
Leading Hand:
-
1. Attendance during concrete pour
-
Name: if 'NO', reason why:
2. Post tensioning installation
-
Monitored and maintained as much as possible
-
Tendons secured to prevent displacement of damage
-
Anchors and ducting sealed
-
Sufficient cable left has been allowed for stressing (300mm)
3. Other trade measures used to protect tendons
-
Pump lines are supported off tendons
-
Pans kept level and clear of concrete
-
Is there any damage to grout tubes
4. Any issues during concrete pour
-
Reported to:
-
What issues where encountered?
-
Comments / Notes
-
Main Contractor (Print Name and Sign)
-
Fortec Leading Hand (Print Name and Sign)