Title Page
Task Inspection 2 - Concrete Drilling
Complete Site/Inspection Details
-
Project Name:
-
Project No:
-
Completed By:
-
Date:
-
Signature:
-
Have all personnel involved in the task read and signed onto SWMS?
-
Are personnel wearing the correct PPE as per SWMS requirements?
-
Are personnel involved in drilling trained and competent?
-
Has the condition of drill bits been inspcted prior to use?
-
Are electrical tools and equipment in good working condition?
-
Has the work area been delineated with appropriate warning signs?
-
Is an earth leakage unit in use? And if so, numbered and current tag?
-
Are electrical leads separated from water hose lines when diamond core drilling?
-
Are leads elevated above ground level on non conductive stands or hooks?
-
Has the presence of buried services been investigated in the area to be drilled?
-
Are handles and guards fitted and in good condition (i.e. grinders/drills/jack hammers, saws, etc.)?
-
Is the power source switched off when removing concrete from core bits?
-
Are dust emissions being adequately controlled during application?
-
Is waste being disposed of as per local regulatory requirements?