Task Inspection 19 - Fixed Scaffolding
Complete Site/Inspection Details
-
Project Name:
-
Project No:
-
Completed By:
-
Date:
-
Signature:
-
Have all personnel involved in the task read and signed onto SWMS?
-
Has the scaffold design been verified by a third party structural engineer (scaffold over 4m)?
-
Is the scaffold constructed according to the scaffold design plan?
-
Are sole boards and baseplates set up on level ground?
-
Are scaffold ties secured to the structure or building vertically every 4m & horizontally every 3rd bay?
-
Is scaffolding over 4m erected, modified and dismantled by suitably trained scaffolder - HRWL SB, SI, SA?
-
Are Scafftags fitted at all access points, clearly visible and within 30 days of inspection?
-
Are all working platforms fully planked, secured and no gap between planks exceeds 10 mm?
-
Are working platforms clear, unobstructed and access not less than 450 mm wide?
-
Is the working load limit (WLL) of the scaffold identified on scafftag and adhered too? Light=225kg, Medium=450kg, Heavy=675kg?
-
Are top rails between 900mm and 1100mm in height and are midrails and toe boards in place?
-
Are ladders secured at top & bottom, ≈ 1:4 slope and extended at least 900mm above landing platform?
-
Is there sufficient public protection/safeguards against electric powerlines and mobile plant/vehicles?
-
Are scaffolders wearing safety harnesses and are tool lanyards utilised?