Title Page
-
Project number
-
Location
-
Conducted on
-
Prepared by
-
Today's generation
-
Yesterday's generation
-
This Month's generation
-
Total generation so far
-
Inverter Front Photo
-
Meter/Switch board photo
Labels
-
PV DP / PV SW / PV AC - Round Green Label
-
PV (Solar) Site Information
-
Main Switch - Grid Supply
-
Main Switch - Inverter Supply
-
Shutdown Procedure
-
'Solar' on solar conduit every 2 meters
-
Manhole DC Voltage Warning
-
PV String Disconnection Point - on Panel Frame
-
PV String warning - on +ve and -ve cable of string
-
Other Labels
undefined
Switch Board-Inverter
-
Voltage @MPPT1
-
Voltage @MPPT2
-
Voltage @MPPT3
-
Voltage@MPPT4
-
Any LV Cables have been found to be damaged?
-
Is all electrical equipment for the system installed in accordance with AS/NZS3000?
-
Are Isc and Voc ratings calculated correctly as per AS/NZS5033:2021 Clause 4.2.?
-
Does the clearance around the inverter meet the manufacturer’s minimum requirements?
-
Is the inverter securely and safely installed with all fixing/locking screws present?
-
Are MC4 connections tight and secure?
Wiring
-
Are all cables/wiring securely fixed in place to minimise <br>any movement of the cable?
-
Stainless Steel cable ties are used as necessary?
-
Are the roof/wall penetrations/holes suitably installed, sealed and waterproof?
-
Is the array wiring and wiring to the inverter protected from UV/mechanical<br> damage? <br>
-
Has double insulation been maintained on all cables as per the AS/NZS 3000:2018?
-
Is the compliant DC cable has been used as per the AS/NZS 5033:2021?
-
Do the PV array mounting frames and modules have an equipotential bond connected to the earthing terminal on the switchboard/distribution board to which the inverter is connected, either directly or via the inverter main earth conductor?
-
Do the PV array frame and module earthing connections and methods comply with Australian Standards? (AS/NZS3000:2018 and AS/NZS5033:2021)
-
Are all DC cable(s) installed within the ceiling space, wall cavity or floor enclosed in heavy duty conduit or equivalent?
Roof-Ceiling
-
Is the array's maximum voltage VoC array max (at minimum temperature) less than 600vDC?
-
Does the designed array fit on the available roof area? (e.g. solar panels are not positioned over roof edges or gutters)
-
Is PV Array modules have been attached outside of manufacturers clamping zones?
-
Are DC connectors (MC4) mated with those of the same type from the same manufacturer as required?
-
Are MC4 connections tight and secure?