Title Page
-
Prepared by
-
Location
-
Installation Date
-
Insulation System
-
Handover Date
-
Measure 100% Installed
-
Percentage of Property Treated POPT(%)
Installation Evidence
MID INSTALLATION
-
All Elevations
-
PPE Evidence
-
Floor Hatch (Pre)
-
Total Floor Depth
-
Joist Depth
-
Sub Floor Area x 4 (Pre)
-
Active Pipework (Pre)
-
DPC ( All Elevations)
-
Internal Sub Floor Vents Photos (Pre)
-
External Sub Floor Vents (Pre)
-
Service Pipes (Pre)
Post Installation
-
Moisture Meter x4
-
Mid Installation x4
-
Completed Bays x4
-
Cables Safeguarded
-
Exposed Vents (Mid)
-
Upgraded Sub Floor Vents
-
Service Pipes Sealed (Post)
-
Insulated Hatch (Post)
-
Active Pipework Lagged
-
Rolls Used
-
Insulation Depth
-
Area M2