Information
-
Audit No.
-
Auditor:
-
Conducted on
-
Location.
D1.0. Pre Start Meeting. Performance Objective.
-
D1.01 Traffic management according to TTM plan and appropriate for site, changes recorded.
-
D1.02. Spill kit on site?
-
D1.03. MSDS sheets on site for all hazardous substances?
-
D1.04. Daily site specific hazard document completed, all hazards identified and appropriate control measures implemented?
-
D1.05. Task objective?
-
D1.06. All paperwork including plans and consents on site?
-
D1.07 No additional hazards identified?
-
D1.08 All operatives signed onto plan confirming acknowledgement of hazards and control measures?
-
D1.09 Worksite supervisor on site?
-
Comments/Recommendations
2.0. Plant and Equipment: Performance Objective.
-
D2.01. Are 2 fire extinguishers available?
-
D2.02. First Aid kit - Full and tidy?
-
D2.03. Drinking water available?
-
D2.04. Gas go seekers available and within valid test date?
-
D2.05. Does vehicle have current Registration?
-
D2.06. Does vehicle have current Warrant of Fitness?
-
D2.07. Fire extinguishers, leads, EF welder all have current test certificate?
-
Comments/Recommendations
D3.0. PERSONNEL PROTECTIVE EQUIPMENT. Performance Objective.
-
D3.01. Hard Hat (3years)
-
D3.02. Full cover Fire Retardant overalls?
-
D3.03. Safety footwear?
-
D3.04. Anti Static High Vizible Vest?
-
D3.05. Safety Eye Wear?
-
D3.06. General Purpose Gloves?
-
Comments/Recommendations
D4. PERSONNEL COMPETENT.
-
D4.01. Individual competent for task?
-
D4.02. Competency Available?
-
D4.03. Competency Card or dispensation display expiry date?
-
D4.04. Operatives not working under influence of alcohol and or drugs?
-
D4.05. No dangerous acts observed likely to cause harm or injury?
-
D4.06. Operatives observed working safely?
-
D4.07. Plant or Equipment left in a safe manner?
-
Comments/Recommendations
D5. GMS METER KIT REPLACEMENT. Performance Objective.
-
D5.01. Is the base of the meter and the cover above finished ground level?
-
D5.02. Is the service valve installed between 150mm and 300mm above finished ground level and in an operable location?
-
D5.03. Is there an exclusion zone around each installation?
-
D5.04. Tracer wire taped and terminated below riser as per standard?
-
D5.05. Installation leak free
-
D5.06. Has the GMS bracket been fixed to the dwelling using type 316 stainless steel fittings?
-
D5.07. Has the GMS been vertically and horizontally levelled?
-
D5.08. Are all the open ends on fittings either plugged or capped and gas tight to prevent any unwanted material entering the components?
-
D5.09. Location compliant.
-
D5.10. Meter sealed.
-
D5.11. Regulator sealed.
-
Comments/Recommendations
D6.0. Work Area / General Quality. Performance Objective.
-
D6.01. Is the road berm area adequately reinstated?
-
D6.02. Is the customers property adequately reinstated?
-
D6.03. Roadway/footpath reinstated to standard?
-
Comments/Recommendations
D7.0. WORK PROCEDURES BEING FOLLOWED. Auditor observed the following.
-
D7.01. Test and or purge procedure on main or service pipe
-
D7.02. Operated gas detector to locate leak or check gas concentration
-
D7.03. Correct depth of pipe as per Powerco standard
-
D7.04. Conduct EF welding
-
D7.05. Pipe laying and backfilling (thrusting or open trench)
-
Comments/Recommendations
NON COMPLIANCE REPORT.
-
Add media
Site Address.
Operative Name.
NCR To Be Completed By.
-
Select date
NCR COMPLETED.
-
Select date
Completed by.
-
Name =