Information
-
Engineer:
-
Site Name
-
Conducted on
-
Asset ID referrence
-
Location
-
Make
-
External S/N
-
Internal S/N
TASKS
-
Gas Type
-
Notes
-
Gas Charge
-
Notes
-
Duty in KW Heating
-
Notes
-
Duty in KW Cooling
-
Notes
-
Check Filters/Cleaned
-
Notes
-
Check Filters/Replaced
-
Notes
-
Check fan motors and components
-
Notes
-
Check compressor for undue noise and vibration
-
Notes
-
Check Compressor discharge and suction pressure
-
Notes
-
Check refrigerant charge level in reciever/sight glass
-
Notes
-
Check bearings and lubricate fans/motors/damper drives
-
Notes
-
Check of any refrigerant gas or oil leaks
-
Notes
-
Check fan guard covers and inspection plates
-
Notes
-
Check and clean evaporator/coils/drains/drip tray/pump
-
Notes
-
Check condensate drain is clear and clean
-
Notes
-
Check refrigerant pipework for vibration - rectify loose/inadequate supports/fixings
-
Notes
-
Check flexible electrical conduit for damage
-
Notes
-
Isolate control panel and inspect for signs of overheating
-
Notes
-
Confirm that system operation is in accordance with design parameter - adjust if necessary
-
Notes
-
Record Temp set point
-
Notes
-
Ambient Temp during test
-
Notes
-
Internal temp during test
-
Notes
-
Humidity during test
-
Notes
-
Maximum cooling
-
Notes
-
Maximum heating
-
Notes
-
Clean down all surfaces of indoor and outdoor units
-
Notes
-
Check remote control for correct operation/replace batteries
-
Notes
-
Photos before and after service to be submitted as part of report
-
Notes
-
Within 7 days of completing the service, submit service sheets detailing any outstanding defects to NWR Site Manager together with estimate costs to rectify any problems found
-
Notes
-
Any comments/condition report of the asset/recommendations
-
Notes
PLEASE PROVIDE PHOTOS
-
Before Indoor
-
After Indoor
-
Before Outdoor
-
After Outdoor
Signature
-
Add signature