Check and clean Evaporator/colis/drains/drip tray/pump
Check condensate drains is clear and clean
Check Refrigerant pipework for vibration - rectify loose/inadequate supports/fixings
Check flexible electrical conduit for damage
Isolate control panel and inspect for signs of overheating
Confirm that system operation is in accordance with design parameter - adjust as necessary
Record Temp set point
Ambient Temp during test
Internal temp during test
Humidity during test
Maximum Cooling
Maximum Heating
Clean down all surfaces of indoor and outdoor units
Indoor
Outdoor
Notes
Check remote control for correct operation/replace batteries
Indoor Before
Indoor After
Outdoor Before
Outdoor After
Within 7 days of completing the service, submit service sheets detailing any outstanding defects to NWR Site Manager together with estimate costs to rectify any problems found.
Any comments/Condition report of the asset/Recommendations
The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions.
The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice.
You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction.
You should independently determine whether the template is suitable for your circumstances.