Title Page
-
Pre-construction Instruction Form
-
Date
-
Document No.
-
Audit Title
-
Building Coordinator
-
Supervisor
Location details
-
Site details :
-
House type :
-
General :
-
Melways ref :
-
Client details :
-
Client name :
-
Telephone :
-
Email :
-
Other
-
Mobile :
Site Condition
-
Site Condition
-
Is re-establishment survey required?
-
Is there all weather access into the property?
-
Is a meeting required with the client on-site?
-
Are temporary services available?
-
Is the grass to be mowed?
-
Has the previous dwelling been demolished?
-
Other items to be removed by client?
Prior Damage Report
-
Prior Damage Report
-
Footpath
-
Number of bays damaged :
-
Kerb & Channel
-
Damaged :
-
Vehicle crossing
-
Damaged :
-
Fencing
-
- left
- right
- rear
- N/A
-
To be removed :
Siting
-
Siting
-
Are the levels on the siting a true indication of existing conditions?
-
Description :
-
Is there a minimum of one in five gradient access into garage?
-
Description :
OHS Considerations
-
OHS Considerations
-
Soil/Silt barriers required
-
Safe pedestrian access
-
Site adjoining assets required protection
-
Clear of contaminates?
-
Overhead power permit applied for?
-
OHS Notes
-
Comments