Title Page

  • Site name

  • Conducted on

  • Prepared by

  • Location
  • Description of site

  • Description of works

  • Principal Contractor

  • Client

  • Other consultants

Untitled Page

  • Key dates / length of project?

  • F10 Notification required?

  • Will the property be occupied or unoccupied during these works?

  • Site working hours

  • When was the building built?

  • Access and egress (including deliveries)

  • Material access and egress

  • Site vehicle access arrangements / restrictions

  • No-go areas and other restrictions

  • Previous land / current use

  • Any planning restrictions?

  • Existing records / plans of building / fire risk assessment / Asbestos Surveys etc (existing H&S File)

  • How does the client wish for the H&S file to be handed over?

  • Site Security, hoarding, barriers, CCTV , signage etc (including prevention of Arson)

  • Welfare provisions

  • First aid arrangements

  • Specific significant hazards noted

  • Fire arrangements to include: fire evacuation / site fire risk assessment / site fire alarm systems / hot work prevention / design details that prevent the passage of smoke, heat and flames / fire fighting systems / site security arson etc.

  • Fire compartmentation and fire stopping

  • Waste removal / skip location / storage location

  • Lighting around the site

  • What working at height activities will be undertaken?

  • Services crossing and serving the site, including overheads, installed services, buried and hidden (take photos)

  • Surround land use

  • Are there any hazardous materials or land contamination on site? If so, take notes and photos.

  • Existing ground conditions (take photos)

  • Structure condition (take photos and notes)

  • Access restrictions for plant / equipment (take photos)

  • Design alterations

  • Electricity required for the site, is a temporary electrical supply required?

  • Are demolition works required? If so, consider structural surveys, prevention of falls from height including materials, connected services, hazardous material mitigation, fire mitigation, dust, noise & vibration mitigation, worker involvement etc

  • If traffic management needed?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.