Title Page
-
Audit Title
-
Job Number
-
Conducted on
-
Prepared by
-
Job Address
-
Photos to be taken of existing fences, retaining walls, site, footpaths, kerbs. Close ups are required of damages.
-
Any visible damage to footpath?
-
Footpath photos
-
Any visible damage to kerbing?
-
Kerb photos
-
Any visible damage to fencing?
-
Fencing photos
-
Has the water meter been installed and not damaged?
-
Is there any damage to the electrical dome?
-
Is the sewer invert visible and undamaged?
-
Are the survey pegs in place and not disturbed?
-
Is there overhead power lines and is protection required?
-
Is Traffic Management required?
-
Is temp fencing required?
-
Does the site have good access?
-
Is kerb removal required?
-
Is a temporary crossover required?
-
Has the Builders sign and safety signage been installed?
-
Is the temporary power on site?
-
If the temporary power has been installed, has the Site Safety Management Plan been placed inside?
-
Name: