Title Page

  • Audit Title

  • Job Number

  • Conducted on

  • Prepared by

  • Job Address
  • Photos to be taken of existing fences, retaining walls, site, footpaths, kerbs. Close ups are required of damages.

  • Any visible damage to footpath?

  • Footpath photos

  • Any visible damage to kerbing?

  • Kerb photos

  • Any visible damage to fencing?

  • Fencing photos

  • Has the water meter been installed and not damaged?

  • Is there any damage to the electrical dome?

  • Is the sewer invert visible and undamaged?

  • Are the survey pegs in place and not disturbed?

  • Is there overhead power lines and is protection required?

  • Is Traffic Management required?

  • Is temp fencing required?

  • Does the site have good access?

  • Is kerb removal required?

  • Is a temporary crossover required?

  • Has the Builders sign and safety signage been installed?

  • Is the temporary power on site?

  • If the temporary power has been installed, has the Site Safety Management Plan been placed inside?

  • Name:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.