Information

  • Site conducted

  • Document No. GYP 017 v1.0

  • Client / Site

  • Audit Title

  • Block/Plot No

  • Location
  • Prepared by

  • Conducted on

  • Working area left clean and tidy by other trades

  • Works by all preceding trades are complete & signed off

  • All windows and doors installed

  • All reveals/corner beads are square and plum

  • Check hidden areas i.e under and around window boards,radiator pipes and pipes in the cupboard

  • All Access panels fitted

  • Any other issues in the plot i.e patches or damages to walls or ceilings that requires site instruction.

  • All the work has been sanded down neatly and the plot is left dust free .

  • Area left clean and tidy ready for handover

  • Select date

  • Gypcraft Manager

  • CPPLC Manager

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.