Title Page

  • Site conducted

  • Machine(s) serial number

  • Conducted on

  • Prepared by

Pre-operation checklist

  • Check all welds around the baler for damage

  • Check visible hydraulic connections and pipes for leaks or damage

  • Check all panel bolts are tight and panels are in place

  • Check for any oil leakage around the bailer

  • Check feeder is clear

  • Check power lead for any damage

After start-up

  • Check all the safety sensors / interlocks are working as they should

  • Run the baler to ensure the ram moves freely within the machine

Cleaning

  • (Make sure the power is isolated before cleaning commences, please initial if OK, or mark with an X if
    unsafe)

  • Clean all debris from the lifting arm and inside cage.

  • Remove debris from around the baler:

  • Open panels at back and clean out card debris behind the ram if applicable:

  • Jet wash the baler and around it. (as per site schedule)

At end of shift

  • Isolate baler and padlock in place

  • If any faults are found report to helpdesk and put machine out of order

  • I can confirm all checks have been completed

  • List any issues identified during the operation and action taken

  • Operator Name and Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.