Pre Paint Audit

  • - Site photo's front, rear and sides.

  • Photo of meter box documentation (signed page).

  • - Have you received the necessary paperwork for the frame to pass?

  • - Do all the downpipes/droppers match the current plans?

  • - Is all cladding, brickwork and rendering completed and vermin proof around the whole house?

  • - Are all services slabs in the correct position?

  • - Are the clearances around the gas meter box and hot water box correct?

  • - Are you happy that the landscape prep is suitable for the landscaping plan?

  • - Is there any extra retaining required on site or is there any extra retaining on site that isn’t on plans requiring amendments to BA before final inspection

  • - After inspecting pre-paint, are you satisfied with the pre-paint?

  • - Has each trade (fix out, kitchen, tiling) been fully completed?

  • - Is the plastic down for the painter?

  • - Are the top edge of the wall/skirting tiles grouted/sealed?

  • Is the cornice parallel with the robe heads, bulkheads and hampers?

  • Are all water stops at wet area's installed?

  • Are all Falls to wastes correct?

  • Are all Flush transitions done correctly for livability QDC

  • - if all trade work isn’t fully completed up to this stage have you work released the defects to be completed at fit offs?

  • Are there any extra added items required?

  • Are you satisfied with the house at its current stage?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.