Title Page

  • Name of Builder / Owner

  • Address
  • Site Manager

  • Job Number
  • Contact Details

  • Inspection Date

Floor Inspection

Job Overview

  • Is The Gyprocking, Framing, Ceiling, Joinery etc In & Complete? (Only where it will affect flooring)

  • Are Set Downs Installed? (i.e Waterproofing Angles, Sliding Door Tracks etc) ***If missing please note

  • Is Building Weatherproof? (i.e All Windows / Doors Installed, Front Door Covered etc)

  • Any Scaffold / Strcutures In The Way?

  • Does Site Need to Be Cleaned (Dust, Debris, Materials etc)

  • Does Job Involve Step Down?

  • Is Step Down Installed?

  • Are Heights Correct - Will Heights Work? (Consider subfloor height(s) once prep is complete)

  • Is Structure Suitable For Installation? (No excessive movement, creaks, noises etc)

  • Does Job Involve Stair Case?

  • Is Stair Case Installed?

  • Are Heights Correct - Will Heights Work? (Consider subfloor height(s) once prep is complete)

  • Is Structure Suitable For Installation? (No excessive movement, creaks, noises etc)

  • Levels To Be Installed

  • Subfloor System

  • Any Visible Dampness?

  • Can Source of Ingress Be Determined?

  • Moisture Meter Readings Acceptable? (If No, Upload Mudmap)

  • Survey Complete?

  • Slab Within Tolerance For Flatness (With Straight Edge?)

  • Bags Required?

  • Can We Meet Set Heights As Required?

  • Bags Required?

  • Can We Meet Set Heights As Required?

  • Are There Any Other Issues Not Noted Above?

  • Any Visible Dampness?

  • Can Source of Ingress Be Determined?

  • Moisture Meter Readings Acceptable? (If No, Upload Mudmap)

  • Survey Complete?

  • Slab Within Tolerance For Flatness (With Straight Edge?)

  • Bags Required?

  • Can We Meet Set Heights As Required?

  • Bags Required?

  • Can We Meet Set Heights As Required?

  • Is There Any Excessive Movement Or Noises Present?

  • Are Sheets Lipping On Edges? Is Sanding Required?

  • Are There Any Other Issues Not Noted Above?

  • Any Visible Dampness?

  • Can Source of Ingress Be Determined?

  • Survey Complete?

  • Slab Within Tolerance For Flatness (With Straight Edge?)

  • Bags Required?

  • Can We Meet Set Heights As Required?

  • Bags Required?

  • Can We Meet Set Heights As Required?

  • Is There Any Excessive Movement, Noise, Visible Cracking Or Holes Present?

  • Are There Any Other Issues Not Noted Above?

  • Please Provide Details

  • Subfloor System

  • Any Visible Dampness?

  • Can Source of Ingress Be Determined?

  • Moisture Meter Readings Acceptable? (If No, Upload Mudmap)

  • Survey Complete?

  • Slab Within Tolerance For Flatness (With Straight Edge?)

  • Bags Required?

  • Can We Meet Set Heights As Required?

  • Bags Required?

  • Can We Meet Set Heights As Required?

  • Are There Any Other Issues Not Noted Above?

  • Any Visible Dampness?

  • Can Source of Ingress Be Determined?

  • Moisture Meter Readings Acceptable? (If No, Upload Mudmap)

  • Survey Complete?

  • Slab Within Tolerance For Flatness (With Straight Edge?)

  • Bags Required?

  • Can We Meet Set Heights As Required?

  • Bags Required?

  • Can We Meet Set Heights As Required?

  • Is There Any Excessive Movement Or Noises Present?

  • Are Sheets Lipping On Edges? Is Sanding Required?

  • Are There Any Other Issues Not Noted Above?

  • Any Visible Dampness?

  • Can Source of Ingress Be Determined?

  • Survey Complete?

  • Slab Within Tolerance For Flatness (With Straight Edge?)

  • Bags Required?

  • Can We Meet Set Heights As Required?

  • Bags Required?

  • Can We Meet Set Heights As Required?

  • Is There Any Excessive Movement, Noise, Visible Cracking Or Holes Present?

  • Are There Any Other Issues Not Noted Above?

  • Please Provide Details

  • Subfloor System

  • Any Visible Dampness?

  • Can Source of Ingress Be Determined?

  • Moisture Meter Readings Acceptable? (If No, Upload Mudmap)

  • Survey Complete?

  • Slab Within Tolerance For Flatness (With Straight Edge?)

  • Bags Required?

  • Can We Meet Set Heights As Required?

  • Bags Required?

  • Can We Meet Set Heights As Required?

  • Are There Any Other Issues Not Noted Above?

  • Any Visible Dampness?

  • Can Source of Ingress Be Determined?

  • Moisture Meter Readings Acceptable? (If No, Upload Mudmap)

  • Survey Complete?

  • Slab Within Tolerance For Flatness (With Straight Edge?)

  • Bags Required?

  • Can We Meet Set Heights As Required?

  • Bags Required?

  • Can We Meet Set Heights As Required?

  • Is There Any Excessive Movement Or Noises Present?

  • Are Sheets Lipping On Edges? Is Sanding Required?

  • Are There Any Other Issues Not Noted Above?

  • Any Visible Dampness?

  • Can Source of Ingress Be Determined?

  • Survey Complete?

  • Slab Within Tolerance For Flatness (With Straight Edge?)

  • Bags Required?

  • Can We Meet Set Heights As Required?

  • Bags Required?

  • Can We Meet Set Heights As Required?

  • Is There Any Excessive Movement, Noise, Visible Cracking Or Holes Present?

  • Are There Any Other Issues Not Noted Above?

  • Please Provide Details

Risk & Hazard Identification

  • Are There Any Major Risks &/Or Hazards That May Prevent Us From Completing The Work

  • Please List Hazards & Photograph

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.